Environmental Clearance
Compliance Report of
Township and Area Development Project,
Village: Mundra, Dist. Kutch, Gujarat
of Adani Mundra SEZ Infrastructure Pvt. Limited
for the period of April-2017 to September-2017
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : Sep,17
Status of the conditions stipulated in Environment Clearance
Index
Sr. No.
Particulars Page Nos.
1 Compliance Report 01 2 Annexures
Annexure – 1 Six Monthly Environment Monitoring Report 16 Annexure – 2 Summary of Water Consumption and STP Inlet &
Outlet 28
Annexure – 3 Typical copy of record book of BMW disposal 29 Annexure – 4 Green Belt Development details 30 Annexure – 5 Energy Audit Report of Samudra Township 32 Annexure – 6 Fire Mock Drill Report 125 Annexure – 7 Organogram of Environment Cell 127 Annexure – 8 Environment Protection Expenditure 128
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Half yearly Compliance report for Environment Clearance for the project “Township and area development project at Mundra, Dist. Kachchh, Gujarat of M/s. Adani Mundra SEZ Infrastructure Pvt. Ltd.” issued vide letter no. SEIAA/GUJ/EC/8(b)/44/2010 dated 20th February 2010. Sr. No.
Conditions Compliance Status as on
30-09-2017
A. Specific Conditions
A.1 Construction Phase:
1. Minimum Aerial distance of 100 m shall be kept between processing & non – processing areas of SEZ, as proposed.
Complied during the construction phase. Not applicable at present. The details of the compliances with respect to construction phase are submitted in Oct 16 to March 17 compliance report. Construction work for the project is partially completed. However, no construction activity carried out during the compliance period of Apr’17 to Sep’17. All the specific conditions provided for construction phase will be considered upon recommencement of construction activity in future.
2. Height of the buildings in the project shall be restricted to 42 meter (in view of the height restriction specified by the aviation authority) or the height permissible under the bylaws prescribed the SEZ authority, whichever is more stringent. This, however, shall not increase the total population envisaged under the EIA report prepared and submitted to SEAC and SEIAA and shall not increase in the resource consumption like total water usage or wastes generated.
2(a) The requirement for fire prevention, line safety in relation to fire and fire protection of the building shall be fulfilled in the project, as per the National Building Code of India so as to minimize danger to life and property from fire.
2(b) All high rise buildings shall have at least two staircases with a condition that the nearest staircases shall be available at every 30 meter from all places in a given building.
1
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 3. The project proponent shall not
obstruct the flow of river Bhukhi passing through the social infrastructure area and shall not do any encroachment on the said river, as per their undertaking dated 21/07/2009. All necessary precautions and measures shall be taken in order to ensure that natural drainage of river Bhukhi passing through the project site is not altered / affected.
Complied during the construction phase. Not applicable at present. The details of the compliances with respect to construction phase are submitted in Oct 16 to March 17 compliance report. Construction work for the project is partially completed. However, no construction activity carried out during the compliance period of Apr’17 to Sep’17. All the specific conditions provided for construction phase will be considered upon recommencement of construction activity in future.
4. Additional bridge / walkthrough over the Bhukhi river passing through the site shall be provided between the two bridges planned to be provided so as to reduce distance to be travelled during the emergency situations.
5. If SEZ authority permits, adequate parapet / fencing shall be provided along the banks of river Bhukhi passing through the site for preventing fall of animals / humans.
6. All required sanitary and hygienic measures shall be provided before starting the construction activities and to be maintained throughout the construction phase.
7. The construction site shall be provided with adequately barricades of at least 3 m height on its periphery with adequate signage
8. Adequate first aid facilities shall be provided in the project both during construction and operation of the project.
9. Adequate drinking water, sanitation and other amenities
2
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 shall be provided for construction workers at the site. The safe disposal of wastewater and solid wastes generated during the construction phase should be ensured.
10. Provision should be made for the supply of fuel (Kerosene or cooking gas), utensils such as pressure cookers etc. to the laborers during construction phase.
Complied during the construction phase. Not applicable at present. The details of the compliances with respect to construction phase are submitted in Oct 16 to March 17 compliance report. Construction work for the project is partially completed. However, no construction activity carried out during the compliance period of Apr’17 to Sep’17. All the specific conditions provided for construction phase will be considered upon recommencement of construction activity in future.
11. The project proponent shall ensure that the construction labours are provided with adequate amenities for lighting, drinking water, sanitation etc. to ensure that do not ruin the existing environmental condition.
12. Adequate personal protective equipments shall be provided to the construction workers to ensure their safety and the project proponent shall ensure its usage by the labours.
13. All topsoil excavated during construction activities should be stored separately for use in horticultural / landscape development within the project site.
14. Disposal of debris including the excavated material during construction phase shall not create adverse effect on neighbouring communities and shall be disposed of only at the approved sites with the approval of the competent authority after taking the necessary precautions for general safety and health aspects.
15. Use of diesel generator sets
3
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 during construction phase should be enclosed type and confirm to EPA rules for air and noise emission standards.
16. Ready-made mix concrete should be used so far as possible
Complied during the construction phase. Not applicable at present. The details of the compliances with respect to construction phase are submitted in Oct 16 to March 17 compliance report. Construction work for the project is partially completed. However, no construction activity carried out during the compliance period of Apr’17 to Sep’17. All the specific conditions provided for construction phase will be considered upon recommencement of construction activity in future.
17. Water demand during construction should be reduced by use of curing agents, plasticizers and other best practices.
18. Vehicles hired for bringing construction material at site should be in good conditions and confirm to applicable air and noise emission standards and should be operated only during non-peak hours.
19. Ambient noise levels shall conform to residential standards both during day and night. Incremental pollution load on the ambient air and noise quality should be closely monitored during construction phase.
20. Fixtures for showers, toilet, flushing and drinking should be of low flow either by use of aerator or pressure reducing devices or sensor based control.
21. Fly ash should be used as building material in the construction as per provision of Fly Ash Notification under EPA.
22. Structural design aspects in accordance to the seismic zone shall be strictly adhered to.
23. No ground water shall be used and the water required during construction phase shall be sourced from Gujarat Water Infrastructure Ltd.
24. The construction materials and debris shall be properly stored
4
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 and handled to avoid negative impacts such as air pollution and public nuisances by blocking the roads and public passages. Appropriate barricading shall be done and signboards shall be put at such site.
25. Ambient Air Quality Monitoring / Noise monitoring shall be carried out during the construction. The location of ambient air quality monitoring stations and its frequency shall be decided in consultation with GPCB.
Complied during the construction phase. Not applicable at present. The details of the compliances with respect to construction phase are submitted in Oct 16 to March 17 compliance report. Construction work for the project is partially completed. However, no construction activity carried out during the compliance period of Apr’17 to Sep’17. All the specific conditions provided for construction phase will be considered upon recommencement of construction activity in future.
26. The provisions of the buildings and other construction workers rules shall be met with by the project proponent in addition to other statutory requirements under different environmental pollution control and safety related acts and rules.
27. Environment Management Cell shall be formed, which will supervise and monitor the environment related aspects of the project during construction and operational phases in addition to observance of Gujarat Building and other constructions workers act and rules including registration of the project under this act.
A.2 Operation Phase: 28. Fresh water requirement during
the operation phase shall not exceed 9 MLD and it shall be sourced from Gujarat Water Infrastructure Ltd. Metering of the water shall be done and its records shall be maintained. No ground water shall be extracted.
Complied. No ground water is extracted. Fresh water requirement for Samudra township and Adani Hospital is approximately 1.10 MLD which is sourced through Gujarat Water Infrastructure Ltd. (GWIL) pipeline from Narmada water supply and APSEZ desalination plant. No ground water is being Extracted. Record maintained for quantity of water usage during the period Apr’17 to Sep’17 is attached as
5
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017
Annexure – 1. 29. The total sewage generation
from the proposed social infrastructure project shall not exceed 7.2 MLD.
Complied. Average quantity of sewage generation was 810 KLD at Samudra township and 18 KLD at Adani Hospital. Average total quantity of sewage generation was 0.8 MLD. Generated sewage is treated to utilize for horticulture purpose. Details of sewage generated during the periodApr’17
to Sep’17, is attached as Annexure – 2.
30. The project proponent shall install and operate adequate sewage treatment plants (STP) comprising of 3 modules of STP (each of 2.5 MLD) to achieve ultimate capacity of 7.5 MLD, for treatment of sewage. These STP modules shall be operated regularly and effectively to achieve the GPCB norms.
Complied. STP having capacity of 2.5 MLD is constructed and operated in township area. Treated sewage is utilized for horticulture purposes after achieving discharge norms of GPCB.
One STP having capacity of 30 KLD is constructed and operated in Hospital. Treated sewage is utilized for horticulture purposes.
Third party analysis of the treated water is being carried out twice in a month by NABL and MoEF&CC accredited agency namely M/s. Pollucon Laboratory Pvt. Ltd. Summary of the same for duration from Apr’17 to Sep’17 is mentioned below.
PARAMETERS UNIT Min Max
Perm. Limit$
pH -- 6.56 7.61 6.5 – 8.5
TSS mg/L 13 29 30
BOD (3 Days @
27 oC) mg/L 6 19 20
Residual Chlorine
mg/L 0.5 0.9 > 0.5
$ as per CC&A granted by GPCB
Please refer Annexure – 1 for detailed analysis reports. Approx. INR 12 Lakh is spent for all environmental monitoring activities during Apr’17 to Sep’17 .
31. Two modules of STP of 2.5 MLD (i.e. total 5 MLD) shall be installed on one side of the Bhukhi River and one module of STP of 2.5 MLD shall be installed on the other side of the Bhukhi
Complied. At present one STP of 2.5 MLD is installed on one side of Bhukhi river for Samudra Township and one STP of 30 KLD is installed on other side of Bhukhi river for Adani Hospital. Hence no cross drainage civil work is carried out at
6
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 River passing through the social infrastructure project. Hence no any cross drainage civil work shall be carried out.
AMSIPL Area.
32. Out of total 7.2 MLD of treated sewage conforming the GPCB norms, 2 MLD treated sewage shall be utilized within the project area for plantation / gardening whereas balance 5.2 MLD of treated sewage shall be utilized in the identified area of MPSEZL for plantation / gardening.
Complied. During Apr’17 to Sep’17 approx. 0.8 MLD treated water is used for gardening / plantation purpose within township area / APSEZ area.
33. In no case, the wastewater / treated sewage shall be discharged into the river Bhukhi passing through the social infrastructure project.
Complied During Apr’17 to Sep’17 approx. 0.8 MLD treated water is used for gardening / plantation purpose within township area / APSEZ area. Hence in no case, the wastewater / treated sewage is discharged into the river Bhukhi passing through the social infrastructure project.
34. Best available technology shall be used for disinfection of treated sewage before reuse / discharge.
Complied. Chlorination treatment is provided for disinfection before reuse.
35. Rain water harvesting of roof top run off of the building to be constructed as a part of social infrastructure as per the plan submitted shall be implemented. Before recharging the rain water, pre-treatment must be done to remove suspended matter.
Complied. Location of rain water harvesting was earmarked at one of location in identified SEZ area based on direction of flow of storm water channel. However underground water is saline in nature due to sea water ingress and harvested water is likely to get contaminated in high tide. The project will be taken up upon finding out the solution for rain water harvesting within project boundary.
36. The Municipal Solid Waste (MSW) shall be properly collected and segregated at source and it shall be disposed as per the guidelines of the MSW Rules 2000, as may be amended time to time. The dried biomass from the STP will be used as manure in gardening / plantation.
Complied. A well-established system for Municipal Solid Waste (MSW) management is in place. Municipal solid waste collection from AMSIPL area is being done on daily bases. Collected dry waste is being transported to Material Recovery Facility (MRF) where it is being sorted out in different streams e.g. paper/plastic/cardboard/glass/metal. These sorted waste is further transported for recycling.
7
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 AMSIPL has installed Organic Waste Converter within premises for converting food waste in to manure and generated manure is being utilized by horticulture department in green belt area. Total 23.6 MT of food waste was converted to manure during the compliance period Dry waste collection drive including plastic free drive and waste segregation drive is being organised on regularly basis..
37. The Bio-medical Waste (BMW) shall be disposed as per guidelines of BMW rules 1998 as may be amended from time to time.
Complied. Multispecialty hospital has taken the necessary approvals from GPCB for the disposal of Bio Medical Waste. Total 1684.5 kg of bio medical waste was disposed to Common Bio Medical Waste Treatment facility during Apr’17 to Sep’17 by M/s Distormed Kutch Services Pvt. Ltd at the frequency of once in two days. . Log book showing the record of Bio-
medical Waste collection is attached as Annexure - 3
38. Hazardous wastes, if any generated during the operation phase shall be handled as per the Hazardous Waste (Management, Handling & Transboundary Movement) Rules 2008, as may be amended from time to time.
Point Noted. No hazardous waste was generated during the compliance period of Apr’17 to Sep’17. If any hazardous waste generation in future, it will be dispose through authorised agency only.
39. 54,600 sq.m. area shall be earmarked for the parking purpose as proposed. The area earmarked for the parking shall be used for parking only. No other activity shall be permitted in this area.
Complied. Construction work for the project is partially completed. Entire parking area is earmarked within township premises. This parking is earmarked within township premises and is used for said purpose only.
40. Necessary signage including continuous display of status of parking availability at entry, exit and all other appropriate places shall be provided which should have appropriate size of letters and shall be visible from the at least 50 meter distance from the adjacent road.
Complied. Project is under development and area is earmarked for parking area as per National Building Code requirement. Trained security guards are available round the clock to guide/help for entry, exit and parking. Continuous display regarding status of parking availability will be installed once project is in full-fledged operation.
41. No public space shall be used or blocked for the parking and the trained staff shall be deployed to
Complied. Adequate parking area has been provided as per National Building Code. Trained security guards are
8
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 guide the visitors for parking and helping the senior citizens and physically challenged people
available round the clock to guide/help for entry, exit and parking to senior citizens and physically challenged people.
42. Traffic congestion near the entry and exit points from the roads adjoining the proposed project site must be avoided.
Complied. Separate entry and exits have been provided at main gate with architectural divider for proper traffic management. Appropriate arrangements are madefor emergency situations.
43. Common utilities like drinking water facility, toilets etc shall be provided on each floor with adequate signage thereof. Adequate distance shall be maintained between the drinking water and toilet blocks.
Complied. Common utilities like drinking water facility, toilets etc.are provided at Adani Hospital and commercial building with adequate distance between drinking water & toilet facilities..
44. The green belt shall be developed in 50 Hectares area in terms of peripheral green belt around the project site, road side plantation and green belt on either side of the Bhukhi river. The project proponent shall plant at least 20,000 trees in green belt, as proposed. The open spaces inside the social infrastructure project shall be suitably landscape and covered with vegetation of indigenous variety.
Complied. AMSIPL has developed 38.67 ha area as green belt with plantation of 40070 saplings in AMSIPL premises. The open spaces inside the social infrastructure project are suitably landscaped and covered with green lawn and other vegetation.
It may be noted that to enhance the marine biodiversity, till date APSEZ has carried out mangrove afforestation in more than 2800 ha. area across the coast of Gujarat. Total expenditure for the same till date is INR 782 lakh. So, far APSEZ have developed more than 400 ha. area as greenbelt with plantation more than 8.0 Lacs saplings within the APSEZ area. Details of the green belt development activity done by APSEZL Mundra are attached as Annexure – 4.
45. The area earmarked as green area shall be used only for green belt and shall not be altered for any other purpose. The fund earmarked for green belt development shall not be diverted for any other purpose.
Complied. The area earmarked as green area is used only for green belt and not altered for any other purpose. Separate budget for the horticulture department is earmarked every year. The spent budget for Horticulture Departmental for the period of Apr’17 to Sep’17 is INR 554 lacs. Details upon green belt development is provided in condition no. 44 above.
46. The project proponent shall explore the application of solar energy and shall be incorporated
Complied. Solar system of 1.5 MW has been installed within township.
9
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 for the illumination of common areas, lighting of internal roads and passages in addition to solar water heating, if any.
Information has been already submitted to MoEF&CC along with Half Yearly Compliance Report Apr’16 to Sep’16. There is no further change.
47. The acoustic enclosures shall be installed at all noise generating equipments and the noise level shall be maintained as per the MoEF / CPCB guidelines / norms both during day and night time.
Complied. D.G. Sets having acoustic enclosures are provided as stand-by and used in case of main power failure only. However, regular noise monitoring is being carried out. Noise (once in a month) monitoring is being carried out by NABL and MoEF&CC accredited agency namely M/s. Pollucon Laboratory Pvt. Ltd. Summary of the same for duration of Apr’17 to Sep’17 is mentioned below. Total Sampling Locations: 2 Nos.
Noise Unit Avg. Value Perm. Limit
Day Time dB(A) 62.9 75
Night Time dB(A) 58.3 70
Please refer Annexure – 1 for detailed analysis reports. Approximately INR 12 Lakh is spent for all environmental monitoring activities during the compliance period (till Sep 2017).
48. The project proponent shall install the electric appliances, which are energy efficient and meeting with the Bureau of Energy Efficiency norms, wherever applicable.
Complied.
Energy Conservation through Installation of Motion Sensor (Occu switch) & AC Temp. Controls in buildings are provided. AMSIPL has installed the electric appliances which meets the Energy Efficiency norms.
49. The energy audit shall be conducted at regular interval for the project and the recommendations of the audit report shall be implemented with spirit.
Complied. Energy audit for Samudra Township is carried out regularly and report of the same is attached as
Annexure – 5. Recommendations of this report will be implemented gradually. Energy audit is carried our once in a three years. Last audit was carried out on 21.01.2017 by M/s. Mitcon Consultancy & Engineering Services Ltd.
50. The roof should meet regulatory requirement as per Energy Conservation Building Code by using appropriate thermal insulation material to fulfil requirements.
Complied. Energy Conservation Building Code. is considered during the development of buildings.
51. Use of glass shall be minimal to Complied.
10
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 reduce the electricity consumption and load on air-conditioning.
Minimal glass is used in air conditioning areas to reduce electricity consumption and load on air-conditioning.
52. Risk estimation shall be carried out for the project and disaster management plan shall be prepared and its recommendations shall be implemented in the time bound manner.
Complied. Emergency Response Plan was prepared by Trivedi & Associates Technical Services Pvt. Ltd in August, 2015 for AMSIPL which included risk estimation for medical emergency, fire emergency, natural calamities. Detail are submitted to the MoEF & CC along with half yearly compliance report for the period from Apr – 2015 to Sep – 2015. Various plans as fire service plan, communication plan, mutual aid plan, evacuation plan are implemented to combat with emergency situations.
53. The raw water sumps will be equipped with suction differential head / partition so as to insure that minimum 500 KL water shall remain reserved as fire water as proposed.
Complied. 250 KL of fire water is reserved with fire hydrant system for Adani hospital. Approximately 400 KL water is available in 6 different water tanks at various sectors of Samudra Township. In total, more than 500KL water is reserved as fire water at AMSIPL.
54. Necessary emergency lighting system along with emergency power back up system shall be provided. In addition, emergency public address system arrangement and signage for emergency exit route shall be provided on each floor.
Complied. Power is supplied through M/s MPSEZ Utilities Private Limited to the project site.
Power failure is the rarest situation in the area and in case of such emergency, there is provision of 125 KVA movable DG set. Public address system is available with the security staff in the vicinity. Emergency contact is display each block as below
Security control 8980048877
Township Security control
8980015046
Medical Adani hospital reception
2838-619555
Medical Emergency Number -
2838-619667
Medical Emergency mobile Number
7574848413
Fire control room- 2838-255801
Fire control room mob. 9879114996
55. Necessary auto glow, signage at all appropriate places shall be
Complied. Auto glow signage is provided at adequate locations
11
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 provided to guide the people towards exits and assembly points during the unforeseen emergency and eventuality conditions.
to provide guidance to the people towards exits. Also the township & Adani Hospital is under security guard surveillance to combat with unforeseen emergency conditions. Photograph showing the auto glow signages were submitted along with last compliance submission for the duration of Oct’16 to Mar’17.
56. Training to the staff for the First Aid and Fire Fighting Alarm with regular mock drill shall be conducted regularly and shall be made in integral part of the disaster management plan of the project.
Complied. For first aid situations a First Aid centre is provided at Samudra Township. Multispecialty Hospital is part of the project activity which can be utilised for medical emergencies. APSEZ has provided training to 19 personnel for First-aid through Red Cross Society during 20.04.17 to 21.04.17. Regular mock drill is also conducted at project site. The report of the same is attached as Annexure – 6.
57. Ozone Depleting Substance (Regulation and Control) rules shall be followed while designing the air conditioning system of the project.
Complied. Ozone Depleting Substance inventory was produced and is maintained during the compliance period of Apr’17 to Sep’17. New gas being used in refilling is ozone friendly in nature.
58. Environment Management Cell shall be formed by the project proponent during operation phase which will supervise and monitor the environment related aspects of the project including incremental pollution loads on the ambient air quality, noise and water quality periodically till the management of the project remains with the project proponent.
Complied. APSEZL as group has a well structured Environment Cell, staffed with qualified manpower for implementation of the Environmental Monitoring and Management Plan. Organogram showing Environment Management Cell is attached as Annexure – 7. Ambient Air Quality (twice in a week) and Noise (once in a month) monitoring are being carried out by NABL and MoEF&CC accredited agency namely M/s. Pollucon Laboratory Pvt. Ltd. Summary of the same for duration from Apr’17 to Sep’17 is mentioned below. Total Sampling Locations: 2 Nos.
Parameter Unit Min Max Perm. Limit$
PM10 μg/m3 38.6 92.8 100
PM2.5 μg/m3 15.4 54.5 60
SO2 μg/m3 5.2 26.4 80
NO2 μg/m3 16.4 44.3 80
Noise Unit Avg. Value Perm. Limit
12
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017
Day Time dB(A) 62.9 75
Night Time dB(A) 58.3 70
$ as per NAAQ standards, 2009 Please refer Annexure – 1 for detailed analysis reports. Approx. INR 12 Lakh is spent for all environmental monitoring activities during compliance period (till Sep’17)
B. General Conditions
59. The project proponent shall permit the outside people to use the social infrastructures like hospital, schools, colleges etc. coming up in the proposed project, as per their undertaking dated 21/07/2009.
Complied.
Outside people are allowed access to use the social infrastructures like hospital and school. Total 5840 patients including OPD (Out Patient Department) as well IPD (In-Patient Department) from nearby villages were treated in the Hospital during Apr’17 to Sep’17. Approx Rs. 47.25 Lakh worth of free medical services given to nearby villagers during Apr’17 to Sep’17.
60. Various provisions of the Environment (Protection) Act, 1986 and the Rules / Notifications issued there under by the Ministry of Environment and Forest, Govt. of India, from time to time shall be strictly complied with.
Point noted.
61. No further expansion or modification in the plant shall be carried out without prior approval of the MoEF/SEIAA as the case may be. In case of deviations or alterations in the project proposal from those submitted to MoEF / SEIAA / SEAC for clearance, a fresh reference shall be made to the SEIAA / SEAC to assess the adequacy of conditions imposed and to add additional environmental protection measures required, if any.
Point noted.
62. The project authorities shall earmark adequate funds to
Complied. Separate budget for the Environment cell is
13
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 implement the conditions stipulated by SEIAA as well as GPCB along with the implementation schedule for all the conditions stipulated herein. The funds so provided shall not be diverted for any other purpose.
earmarked every year. All environmental and horticulture activities are considered at group level and budget allocation is also done accordingly. Budget for environmental management measures (including horticulture) for the FY 2017-18 is to the tune of INR 966 lakh. Out of which, Approx. INR 682 lakhs are spent during compliance period. Detailed breakup of the expenditures is attached as Annexure –8.
63. The applicant shall inform the public that the project has been accorded Environmental Clearance by the SEIAA and i.e. copies of the clearance letter are available with the GPCB and may also be seen at the website of SEIAA / SEAC / GPCB. This shall be advertised within seven days from the date of the clearance letter, in at least two local newspaper that are widely circulated in the region, one of which shall be in the Gujarati language and the other in English. A copy each of the same shall be forwarded to the concerned regional office of the Ministry.
Already complied. Not applicable at present. The advertisement was circulated in Gujarati language through local newspaper – Kutchh Mitra as well as in English language through local newspaper – Indian Express on the date of 10.03.2010. Information has been already submitted to MoEF & CC along with half yearly compliance report April – 2015 to Sep – 2015 and there is no further change.
64. It shall be mandatory for the project management to submit half yearly compliance report in respect of the stipulated prior Environmental Clearance terms and conditions in hard and soft copies to the regulatory authority concerned, on 1st June and 1st December of each calendar year.
Complied. Last compliance report submitted to the Ministry of Environment, Forests & Climate Change as well as SEIAA with letter reference No. APSEZL/EnvCell/2017-18/005 dated 23.05.2017 in soft as well as hard copy.
65. The project authorities shall also adhere to the stipulations made by the Gujarat Pollution Control Board.
Point noted.
66. The project authorities shall inform the GPCB, regional office of MoEF and SEIAA about the
Complied
14
Adani Mundra SEZ Infrastructure Pvt. Ltd., Mundra.
From : April,17 To : September,17
Status of the conditions stipulated in Environment Clearance
Sr. No.
Conditions Compliance Status as on
30-09-2017 date of financial closure and final approval of the project by the concerned authorities and the date of start of the project.
67. The SEIAA may revoke or suspend the clearance, if implementation of any of the above conditions is not found satisfactory.
Point noted.
68. The company in a time bound manner shall implement these conditions. The SEIAA reserves the right to stipulate additional conditions, if the same is found necessary. The above conditions will be enforced inter-alia under the provisions of the water (Prevention and Control of Pollution) Act, 1974, Air (Prevention and Control of Pollution) Act, 1981, the environment (Protection) Act, 1986, Hazardous Wastes (Management and Handling) Rules 2003 and the Public Liability Insurance Act, 1991 along with their amendments and rules.
Complied. The company has implemented the provided conditions and the compliance report is being submitted regularly. Last half yearly compliance report was submitted to Ministry of Environment, Forest & Climate Change and other concerned government agencies / offices vide our letter reference No. APSEZL/EnvCell/2017-18/005 dated 23.05.2017 in soft as well as hard copy. A copy of the same is also available on our weblink: https://www.adaniports.com/ports-downloads
69. This environmental clearance is valid for five years from the date of issue.
Point noted.
Additional condition – (amendment to Environment Clearance Order No. SEIAA/GUJ/EC/8(b)/44/2010 dated 20 February 2010
-- The applicant shall carry out comparative carbon footprint study of low rise building with large ground coverage v/s high rise building with low ground coverage through reputed institute like CEPT or GIDR and submitted to SEIAA within one year from the issuance of EC.
Complied. Comparative carbon footprint study report submitted to the MoEF & CC along with half yearly compliance report Oct – 2014 to March – 2015.
15
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
“HALF YEARLY ENVIRONMENTAL MONITORING REPORT”
FOR
ADANI MUNDRA SEZ INFRASTRUCTURE PVT. LTD. TAL: MUNDRA, KUTCH, MUNDRA – 370 421
MONITORING PERIOD:
APRIL 2017 TO SEPTEMBER 2017
PREPARED BY:
POLLUCON LABORATORIES PVT.LTD.
PLOT NO.5/6 "POLLUCON HOUSE", OPP. BALAJI INDUSTRIAL SOCIETY, OLD SHANTINATH SILK MILL LANE, NEAR GAYTRI FARSAN MART, NAVJIVAN CIRCLE, UDHANA MAGDALLA ROAD, SURAT-395007.
PHONE/FAX – (+91 261) 2455 751, 2601 106, 2601 224. E-mail: [email protected] Web: www.polluconlab.com
TC - 5945 ISO 9001:2008 ISO 14001:2004 OHSAS 18001:2007
16
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
RESULTS OF STP WATER OUTLET
S
R. NO
TEST PARAMETERS
Unit
AMSIPL SAMUNDRA TOWNSHIP STP OUTLET
April-17 May-17 June-17 GPCB Permissible
Limit TEST METHOD
5/4/17 17/4/17 5/3/17 17/5/17 6/6/17 19/6/17
1 pH -- 7.09 6.63 6.94 7.49 6.56 7.46 -- IS3025(P11)83Re.02
2
Total
Suspended
Solids
mg/
L 24 26 28 13 26 28 30 IS3025(P17)84Re.02
3 BOD (3 days
@ 270 C)
mg/
L 18 17 19 16 12 14 20
IS 3025
(P44)1993Re.03Editi
on2.1
4 Residual
Chlorine
mg/
L 0.8 0.5 0.5 0.6 0.7 0.6 Min 0.5
APHA(22ndEdi)4500
Cl
SR.
NO
TEST PARAMETERS
Unit
AMSIPL SAMUNDRA TOWNSHIP STP OUTLET
July-17 Aug-17 Sept-17 GPCB Permissible
Limit TEST METHOD 5/7/1
7 19/7/17 3/8/17 23/8/17 4/9/17 20/9/17
1 pH -- 7.61 7.5 7.39 6.88 7.33 6.9 -- IS3025(P11)83Re.02
2
Total
Suspended
Solids
mg/L 16 22 16 14 22 26 30 IS3025(P17)84Re.02
3 BOD (3 days
@ 270 C) mg/L 10 10 8 6 10 17 20
IS 3025
(P44)1993Re.03Editi
on2.1
4 Residual
Chlorine mg/L 0.5 0.5 0.7 <0.8 0.7 0.7 Min 0.5
APHA(22ndEdi)4500
Cl
17
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
SR. NO
TEST PARAMETERS
Unit
ADANI HOSPITAL STP OUTLET
April-17 May-17 June-17 GPCB Permissible
Limit TEST METHOD
5/4/17 17/4/17 5/3/17 17/5/17 6/6/17 19/6/17
1 pH -- 7.28 7.22 7.13 7.31 7.02 7.4 -- IS3025(P11)83Re.02
2
Total
Suspended
Solids
mg/L 26 24 22 29 22 26 30 IS3025(P17)84Re.02
3 BOD (3 days
@ 270 C) mg/L 14 14 15 14 18 16 20
IS 3025
(P44)1993Re.03Editi
on2.1
4 Residual
Chlorine mg/L 0.5 0.7 0.8 0.9 0.6 0.5 Min 0.5
APHA(22ndEdi)4500
Cl
*Below Detection limit
SR. N
O
TEST PARAMETERS
Unit
ADANI HOSPITAL STP OUTLET
July-17 Aug-17 Sept-17 GPCB Permissible
Limit TEST METHOD
5/7/17 19/7/17 4/8/17 23/8/17 4/9/17 20/9/17
1 pH -- 7.51 7.35 7.49 7.37 7.11 7.34 -- IS3025(P11)83Re.02
2
Total
Suspended
Solids
mg/
L 22 24 24 22 22 20 30 IS3025(P17)84Re.02
3 BOD (3 days
@ 270 C)
mg/
L 16 14 19 16 17 19 20
IS 3025
(P44)1993Re.03Editi
on2.1
4 Residual
Chlorine
mg/
L 0.8 0.8 0.5 0.6 0.7 0.8 Min 0.5
APHA(22ndEdi)4500
Cl
*Below Detection limit
18
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
RESULTS OF AMBIENT AIR QUALITY MONITORING
SAMUDRA TOWNSHIP STP
Sr.
No.
Date of
Sampling
Particulate Matter (PM10)
µg/m3
Particulate Matter (PM 2.5)
µg/m3
Sulphur Dioxide (SO2)
µg/m3
Oxides of Nitrogen (NO2)
µg/m3
1 01/04/2017 66.91 29.52 10.23 31.37
2 05/04/2017 92.59 50.72 25.28 44.28
3 08/04/2017 75.52 32.43 21.79 27.61
4 12/04/2017 49.59 18.71 15.74 34.60
5 15/04/2017 57.58 30.80 17.32 33.67
6 19/04/2017 71.31 40.74 6.26 18.22
7 22/04/2017 56.30 20.37 8.63 22.83
8 26/04/2017 76.19 39.50 12.20 19.37
9 29/04/2017 61.30 28.69 20.12 26.36
10 05/03/2017 53.68 24.53 13.21 31.38
11 05/06/2017 69.29 32.43 16.51 28.89
12 05/10/2017 58.37 26.61 8.60 24.11
13 13/05/2017 72.59 34.51 19.36 34.08
14 17/05/2017 63.32 27.44 17.15 21.41
15 20/05/2017 49.77 21.62 6.88 19.63
16 24/05/2017 56.48 31.60 7.79 36.95
17 27/05/2017 42.52 15.38 11.15 26.81
18 31/05/2017 70.51 28.69 5.18 21.01
19 06/03/2017 78.50 38.66 14.25 42.89
20 06/07/2017 56.79 30.35 7.87 26.73
21 06/10/2017 43.49 18.71 9.44 21.63
22 14/06/2017 58.19 32.43 15.79 35.35
23 17/06/2017 48.19 21.62 12.32 23.54
24 21/06/2017 74.17 40.74 10.94 31.60
25 24/06/2017 52.40 19.54 17.42 27.57
26 28/06/2017 63.38 39.50 20.46 34.41
27 05/07/2017 78.63 44.49 21.74 33.37
28 08/07/2017 82.59 54.46 19.70 20.15
29 12/07/2017 62.71 32.43 10.17 30.22
30 19/07/2017 46.36 19.68 14.88 30.43
Continue..
19
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
SAMUDRA TOWNSHIP STP
Sr.
No.
Date of
Sampling
Particulate
Matter (PM10) µg/m3
Particulate
Matter (PM 2.5) µg/m3
Sulphur Dioxide
(SO2) µg/m3
Oxides of
Nitrogen (NO2) µg/m3
31 22/07/2017 46.79 24.53 13.35 36.31
32 26/07/2017 63.38 30.35 16.52 38.71
33 29/07/2017 40.32 17.46 7.83 19.59
34 02/08/2017 73.62 39.50 20.27 36.61
35 05/08/2017 83.38 53.63 12.26 19.59
36 09/08/2017 61.18 36.59 18.18 38.76
37 12/08/2017 56.30 23.70 16.44 23.69
38 16/08/2017 76.49 44.49 14.14 30.58
39 19/08/2017 68.50 30.35 17.22 22.39
40 23/08/2017 82.71 38.66 21.96 40.48
41 26/08/2017 65.33 26.61 8.67 21.53
42 30/08/2017 40.62 15.38 11.11 27.51
43 02/09/2017 52.58 31.60 8.64 25.39
44 06/09/2017 65.57 29.52 18.19 30.35
45 09/09/2017 76.49 42.41 21.21 19.42
46 13/09/2017 57.58 32.43 15.87 36.51
47 16/09/2017 38.61 15.38 5.24 22.41
48 20/09/2017 56.30 36.59 10.58 32.48
49 23/09/2017 73.62 39.50 26.45 42.68
50 27/09/2017 61.42 24.53 22.69 27.53
51 30/09/2017 54.47 20.37 12.65 24.18
TEST METHOD
IS:5182(Part
23):Gravimetric CPCB - Method (Vol.I,May-
2011)
Gravimetric- CPCB -
Method (Vol.I,May-2011)
IS:5182(Part
II):Improved West and Gaeke
IS:5182(Part
VI):Modified Jacob & Hochheiser (NaOH-
NaAsO2)
20
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
RESULTS OF AMBIENT AIR QUALITY MONITORING
SAMUDRA TOWNSHIP CUSTOMER CARE
Sr.No. Date of
Sampling
Particulate Matter (PM10)
µg/m3
Particulate Matter (PM 2.5)
µg/m3
Sulphur Dioxide (SO2)
µg/m3
Oxides of Nitrogen (NO2)
µg/m3
1 01/04/2017 92.80 42.47 16.38 26.40
2 05/04/2017 81.60 47.47 18.72 33.35
3 08/04/2017 65.48 29.56 7.80 30.43
4 12/04/2017 70.53 33.73 11.74 25.22
5 15/04/2017 51.57 26.46 14.18 31.50
6 19/04/2017 89.31 52.46 19.19 22.30
7 22/04/2017 77.51 35.39 17.56 35.64
8 26/04/2017 83.59 45.38 9.39 23.39
9 29/04/2017 72.52 32.48 12.52 37.52
10 05/03/2017 46.76 20.40 16.52 27.75
11 05/06/2017 57.17 25.40 13.35 24.83
12 05/10/2017 77.21 33.73 11.19 19.94
13 13/05/2017 65.29 29.56 9.42 25.67
14 17/05/2017 56.33 24.57 5.20 30.05
15 20/05/2017 61.50 34.56 10.40 26.50
16 24/05/2017 86.48 48.72 14.92 26.08
17 27/05/2017 55.61 28.73 8.64 20.03
18 31/05/2017 63.49 35.39 12.22 32.34
19 06/03/2017 71.19 34.56 11.77 32.37
20 06/07/2017 62.83 38.72 13.95 36.21
21 06/10/2017 52.60 21.65 5.51 25.56
22 14/06/2017 74.62 35.39 17.55 19.59
23 17/06/2017 65.78 30.40 14.27 33.13
24 21/06/2017 79.32 43.72 7.95 22.15
25 24/06/2017 60.18 23.73 12.33 30.45
26 28/06/2017 45.32 29.56 18.17 29.39
27 05/07/2017 70.71 39.56 11.50 23.39
28 08/07/2017 56.33 33.73 16.64 26.34
29 12/07/2017 69.33 37.47 8.76 17.09
30 19/07/2017 40.20 15.62 10.28 27.40
Continue..
21
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
SAMUDRA TOWNSHIP CUSTOMER CARE
Sr.No. Date of
Sampling
Particulate Matter (PM10)
µg/m3
Particulate Matter (PM 2.5)
µg/m3
Sulphur Dioxide (SO2)
µg/m3
Oxides of Nitrogen (NO2)
µg/m3
31 22/07/2017 62.41 20.40 10.48 28.33
32 26/07/2017 51.51 24.57 14.93 30.77
33 29/07/2017 46.28 19.57 12.22 29.50
34 02/08/2017 65.17 36.64 10.48 27.24
35 05/08/2017 70.59 42.47 14.20 29.40
36 09/08/2017 59.22 26.65 12.74 32.43
37 12/08/2017 49.41 20.40 8.73 26.38
38 16/08/2017 67.52 38.72 17.53 28.59
39 19/08/2017 56.69 35.39 15.88 31.57
40 23/08/2017 75.28 33.73 11.39 37.48
41 26/08/2017 58.61 23.73 13.23 18.38
42 30/08/2017 52.72 19.57 9.67 21.40
43 02/09/2017 45.62 15.41 17.30 30.23
44 06/09/2017 55.12 25.40 21.23 36.66
45 09/09/2017 62.29 38.72 18.32 27.43
46 13/09/2017 76.79 42.47 11.36 33.42
47 16/09/2017 43.57 18.74 7.91 29.52
48 20/09/2017 72.58 46.63 16.65 24.64
49 23/09/2017 67.22 30.40 14.29 31.42
50 27/09/2017 53.38 21.65 13.36 35.00
51 30/09/2017 66.38 26.65 8.68 28.57
TEST METHOD
IS:5182(Part 23):Gravimetric CPCB -
Method (Vol.I,May-
2011)
Gravimetric- CPCB - Method (Vol.I,May-
2011)
IS:5182(Part II):Improved West and
Gaeke
IS:5182(Part VI):Modified Jacob & Hochheiser (NaOH-
NaAsO2)
22
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
RESULTS OF AMBIENT AIR QUALITY MONITORING
PUB/ADANI HOUSE
Sr.No.
Date of Sampling
Particulate Matter (PM10) µg/m3
Particulate Matter (PM
2.5) µg/m3
Sulphur Dioxide (SO2) µg/m3
Oxides of Nitrogen
(NO2) µg/m3
Carbon Monoxide
as CO mg/m3
Hydrocarbon as CH4 mg/m3
Benzene as C6H6
µg/m3
1 04/04/2017 57.59 22.49 18.97 38.58 0.37 BDL* BDL*
2 07/04/2017 62.61 28.73 22.04 29.64 0.44 BDL* BDL*
3 11/04/2017 76.49 36.64 6.33 17.20 0.62 BDL* BDL*
4 14/04/2017 74.49 41.57 9.60 30.46 0.82 BDL* BDL*
5 18/04/2017 63.60 34.56 19.40 24.85 0.25 BDL* BDL*
6 21/04/2017 50.71 20.40 8.79 19.88 0.57 BDL* BDL*
7 25/04/2017 71.47 38.73 13.07 28.83 0.15 BDL* BDL*
8 28/04/2017 60.50 30.40 11.62 21.45 0.60 BDL* BDL*
9 02/05/2017 53.50 28.73 8.73 21.53 0.64 BDL* BDL*
10 05/05/2017 66.20 26.65 20.91 26.53 0.24 BDL* BDL*
11 09/05/2017 75.81 33.73 13.80 30.58 0.11 BDL* BDL*
12 12/05/2017 63.23 30.40 10.95 25.14 0.68 BDL* BDL*
13 16/05/2017 72.40 31.65 17.52 27.76 0.39 BDL* BDL*
14 19/05/2017 61.18 24.57 21.50 42.48 0.30 BDL* BDL*
15 23/05/2017 80.40 41.64 9.59 33.52 0.95 BDL* BDL*
16 26/05/2017 58.58 29.57 18.64 29.85 0.53 BDL* BDL*
17 30/05/2017 81.58 37.48 6.17 19.38 0.70 BDL* BDL*
18 02/06/2017 74.51 37.48 8.89 30.88 1.02 BDL* BDL*
19 06/06/2017 55.42 27.48 11.82 19.80 0.56 BDL* BDL*
20 09/06/2017 49.53 19.57 10.51 26.73 0.13 BDL* BDL*
21 13/06/2017 73.39 34.56 5.61 17.53 0.70 BDL* BDL*
22 16/06/2017 59.32 22.49 18.45 28.06 0.26 BDL* BDL*
23 20/06/2017 68.37 36.64 14.97 38.08 0.31 BDL* BDL*
24 23/06/2017 82.38 30.40 9.63 29.40 0.14 BDL* BDL*
25 27/06/2017 63.41 26.65 15.13 25.54 0.41 BDL* BDL*
26 30/06/2017 45.62 29.57 7.16 22.45 0.72 BDL* BDL*
27 04/07/2017 76.37 37.48 16.63 30.41 0.70 BDL* BDL*
28 07/07/2017 66.89 32.48 11.95 27.42 1.02 BDL* BDL*
29 11/07/2017 70.17 26.65 13.46 18.34 0.56 BDL* BDL*
30 14/07/2017 61.20 28.68 12.72 24.52 0.62 BDL* BDL*
Continue…
23
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
PUB/ADANI HOUSE
Sr.No.
Date of Sampling
Particulate Matter (PM10) µg/m3
Particulate Matter (PM
2.5) µg/m3
Sulphur Dioxide (SO2) µg/m3
Oxides of Nitrogen
(NO2) µg/m3
Carbon Monoxide
as CO mg/m3
Hydrocarbon as CH4 mg/m3
Benzene as C6H6
µg/m3
31 18/07/2017 59.57 23.74 17.59 31.21 0.12 BDL* BDL*
32 21/07/2017 52.63 20.40 10.63 23.14 0.27 BDL* BDL*
33 25/07/2017 69.18 33.73 15.89 33.38 0.31 BDL* BDL*
34 28/07/2017 74.20 39.56 9.90 26.45 0.40 BDL* BDL*
35 01/08/2017 54.61 30.40 10.19 33.76 0.45 BDL* BDL*
36 04/08/2017 66.70 38.73 19.55 36.18 0.50 BDL* BDL*
37 08/08/2017 59.32 33.73 12.83 26.53 0.85 BDL* BDL*
38 11/08/2017 62.30 29.57 15.94 31.26 0.52 BDL* BDL*
39 15/08/2017 78.60 37.48 17.48 23.06 0.33 BDL* BDL*
40 18/08/2017 69.92 28.73 14.86 41.38 0.87 BDL* BDL*
41 22/08/2017 49.59 19.57 11.44 24.60 0.23 BDL* BDL*
42 25/08/2017 52.50 24.57 13.42 35.27 0.32 BDL* BDL*
43 29/08/2017 46.31 21.65 9.71 29.30 0.25 BDL* BDL*
44 01/09/2017 55.42 21.65 12.32 26.89 0.18 BDL* BDL*
45 05/09/2017 78.42 40.39 24.31 37.44 0.26 BDL* BDL*
46 08/09/2017 60.50 27.48 10.63 35.49 0.40 BDL* BDL*
47 12/09/2017 71.91 38.73 26.14 39.15 0.46 BDL* BDL*
48 15/09/2017 65.58 30.40 15.84 25.54 0.29 BDL* BDL*
49 19/09/2017 56.22 25.40 20.59 30.11 0.60 BDL* BDL*
50 22/09/2017 89.57 42.47 18.94 27.53 0.32 BDL* BDL*
51 26/09/2017 68.19 37.48 14.90 33.61 0.54 BDL* BDL*
52 29/09/2017 58.58 24.57 11.33 43.50 0.79 BDL* BDL*
TEST
METHOD
IS:5182(Part 23):Gravimetric
CPCB - Method (Vol.I,May-
2011)
Gravimetric-
CPCB - Method (Vol.I,May-
2011)
IS:5182(Part
II):Improved West and Gaeke
IS:5182(Part VI):Modified
Jacob & Hochheiser
(NaOH-NaAsO2)
NDIR Digital Gas Analyzer
SOP: HC:
GC/GCMS/Gas analyzer
IS 5182 (Part
XI):2006/CPCB Method
24
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
RESULT NOISE LEVEL MONITORING
Result of Noise level monitoring [Day Time]
SR.
NO.
Name of Location SAMUNDRA TOWNSHIP STP
Result [Leq dB(A)]
Sampling Date & Time 19/04/2017 24/05/2017 21/06/2017 26/07/2017 09/08/2017 13/09/2017
1 6:00-7:00 58.4 59.2 62.4 61.7 62.3 63.1
2 7:00-8:00 58.1 63.1 66.1 55.4 58.8 68.4
3 8:00-9:00 62.4 62.8 62.4 59.1 52.1 62.1
4 9:00-10:00 60.4 66.2 59.4 61.7 60 68.1
5 10:00-11:00 68.4 68.1 60.4 65.8 59.7 65.2
6 11:00-12:00 65.7 72.1 60.7 65.1 67.4 59.1
7 12:00-13:00 67.1 70.1 63.4 59.1 62.9 56.1
8 13:00-14:00 62.6 65.1 61.8 62.7 61.4 63.1
9 14:00-15:00 63.4 68.2 65.1 67.4 62.7 61.4
10 15:00-16:00 64.1 62.4 61.4 62.4 64.8 65.2
11 16:00-17:00 68.7 63.4 61.8 61.8 62 68.7
12 17:00-18:00 62.4 65.8 62.7 60.9 67.4 66.2
13 18:00-19:00 68.4 68.1 64.8 63.8 65.8 68.4
14 19:00-20:00 69.4 62.4 59.7 62.8 61.9 64.3
15 20:00-21:00 67.2 64.8 62.4 65.1 59.8 69.8
16 21:00-22:00 62.4 65.6 60.1 61.8 58.1 67.2
Day Time Limit* 75 Leq dB(A)
Result of Noise level monitoring [Night Time]
SR.
NO. Name of Location
SAMUNDRA TOWNSHIP STP
Result [Leq dB(A)]
Sampling Date & Time
19/04/2017
& 20/04/2017
24/05/2017
& 24/05/2017
21/06/2017
& 22/06/2017
26/07/2017
& 27/07/2017
09/08/2017
& 10/08/2017
13/09/2017
& 14/08/2017
1 22:00-23:00 60.4 61.4 59.4 65.1 64 61.4
2 23:00-00:00 61.5 58.4 62.4 58.7 57.2 60.8
3 00:00-01:00 59.8 55.1 61.4 53.7 51.6 65.1
4 01:00-02:00 62.1 5.2 60.4 52.9 50.9 62.9
5 02:00-03:00 60.4 57.1 60.7 52.1 58.8 59.9
6 03:00-04:00 60.8 62.4 61.8 56.4 52.4 60.4
7 04:00-05:00 61.7 61.4 59.7 55.9 60 58.1
8 05:00-06:00 62.5 59.8 62.1 58.4 51.6 62.4
Night Time Limit* 70 Leq dB(A)
25
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
Result of Noise level monitoring [Day Time]
SR.
NO.
Name of Location SAMUNDRA TOWNSHIP CUSTOMER CARE
Result [Leq dB(A)]
Sampling Date & Time 05/04/2017 05/10/2017 28/06/2017 12/07/2017 16/08/2017 27/09/2017
1 6:00-7:00 54.1 58.1 55.1 54.1 52.4 57.1
2 7:00-8:00 59.4 62.1 60.4 59.1 60.4 60.5
3 8:00-9:00 55.1 65.1 62.1 62.4 61.9 63.1
4 9:00-10:00 63.4 60.1 65.4 63.1 58.7 65.1
5 10:00-11:00 68.4 59.4 61.7 69.1 68.4 60.4
6 11:00-12:00 62.4 62.8 65.4 65.1 64.5 69.4
7 12:00-13:00 61.4 65.4 68.4 62.4 65.1 62.4
8 13:00-14:00 68.4 63.1 61.7 60.4 68.7 65.3
9 14:00-15:00 62.1 68.4 65.1 59.7 68.98 69.4
10 15:00-16:00 64.1 62.1 66.1 57.1 62.4 62.4
11 16:00-17:00 63.7 65.1 68.4 60.4 61.4 60.8
12 17:00-18:00 68.4 61.4 63.4 60.9 63.84 59.1
13 18:00-19:00 66.1 68.7 61.8 63.1 59.1 57.2
14 19:00-20:00 66.4 66.7 60.4 66.7 62.7 62.1
15 20:00-21:00 69.4 60.1 62.7 69.1 64.8 65.4
16 21:00-22:00 67.2 59.8 61.8 65.5 61.9 63.1
Day Time Limit* 75 Leq dB(A)
Result of Noise level monitoring [Night Time]
SR.
NO. Name of Location
SAMUNDRA TOWNSHIP CUSTOMER CARE
Result [Leq dB(A)]
Sampling Date & Time 05/04/2017
&
06/04/2017
10/05/2017 &
11/05/2017
28/06/2017 &
29/06/2017
12/07/2017 &
13/07/2017
16/08/2017 &
17/08/2017
27/09/2017 &
28/09/2017
1 22:00-23:00 68.4 62.1 62.4 62.8 60.4 60.4
2 23:00-00:00 65.1 57.1 65.4 65.7 58.8 52.1
3 00:00-01:00 58.1 54.1 59.7 55.4 59.4 57.1
4 01:00-02:00 53.4 51.4 57.4 59.8 54.1 53.4
5 02:00-03:00 62.1 56.1 52.4 56.8 58.5 60.4
6 03:00-04:00 60.4 52.4 56.4 55.4 60.4 62.4
7 04:00-05:00 61.4 58.1 58.4 53.4 54.1 61.4
8 05:00-06:00 60.8 55.1 60.4 68.4 63.7 67.4
Night Time Limit* 70 Leq dB(A)
26
H. T. Shah Dr. Arun Bajpai
Lab Manager Lab Manager (Q)
544, BelgiumTowers, Ring Road, Opp. Linear Bus Stand, Surat-395003. (Guj.).
Tele-Fax: (0261)2455751, 2601106, 2601224. E-Mail: [email protected]. Website: www.pollucon.com
MINIMUM DETECTION LIMIT [MDL]
Ambient Air Parameter
Sr. No. Test parameter MDL
1 Particulate Matter (PM10) 10
2 Particulate Matter (PM 2.5) 10
3 Sulphur Dioxide (SO2) (µg/m3) 5
4 Nitrogen Dioxide (NO2) (µg/m3) 5
Stack parameter
Sr. No. Test parameter MDL
1 Particulate Matter (mg/Nm3) 10
2 Sulphur Dioxide(ppm) 1.52
3 Oxides of Nitrogen (ppm) 2.65
27
ANNEXURE – 2
Water Consumption and Wastewater Generation Details for AMSIPL
(April’1 to September’17)
Month Water Consumption, KL STP Water Inlet, KL STP Water Outlet, KL
Apr’17 30,718 23,974 25,879
May'17 26,373 22,300 24,315
Jun’17 32,160 26,178 27,997
Jul’1 33,134 19,654 19,034
Aug’1 32,704 26,319 22,971
Sep’1 33,164 24,046 23,270
Total 1,88,253 1,42,471 1,43,466
Note: 1. Treated sewage water is completely used for gardening purpose
2. As for the good faith and life of MBR we use to flush the one MBR with treated water from
the other i.e. approx. 4 times a month. That water is again treated through MBR, because of
that the outlet reading is higher than the inlet.
ùẁ
Details of Greenbelt development at APSEZ, Mundra
LOCATION
Total Green Zone Detail
Area (In Ha.)
Trees (Nos.)
Palm (Nos.)
Shrubs (SQM)
Lawn (SQM)
SV COLONY 65.34 30051.00 6965.00 51138.00 80069.00
PORT & NON SEZ
77.52 131942.00 18613.00 68166.78 58455.18
SEZ 99.52 227135.00 15924.00 220449.60 27462.03
MITAP 2.48 8168.00 33.00 1670.00 4036.00
WEST PORT 83.20 182118.00 50221.00 24112.00 22854.15
AGRO- PARK 7.52 17244.00 1332.00 5400.00 2121.44
SOUTH PORT 14.08 25150.00 3430.00 3882.00 4826.97
Samudra Township 38.67 28252.00 11818.00 19978.07 35071.67
Productive Farming 15.69 19336.00 0.00 0.00 0.00
TOTAL (APSEZL) 404.02 669396.00 108336.00 394796.45 234896.44
777732
30
57KM
KM47
KM48
KM49
KM
KM
KM
KM
KM
51
52
53
59
58
44
45
46
KM
KM
KM
KM
20
19
18
17
16
15
14
13
12
11
10
09
07
56/5
55/3
07/8
07/6
07/4
07/2
07/0
06/8
04/4
03/4
62/3
62/5
63/5
63/0
50
61/361/2
61/161/0
55/4
55/5
56/0
57/1
57/5
58/0
58/5
59/0
59/5
60/0
60/5
61/5
62/0
64/0
64/5
66/0
66/5
67/0
67/5
65/0
68/0
60/1
43/8
43/7
43/6
43/5
43/4
43/3
43/9
44/0
44/1
44/2
44/3
44/4
44/5
44/6
44/7
44/8
45/2
45/3
45/4
45/6
45/8
45/9
46/0
46/1
46/3
46/4
46/5
46/6
46/7
46/8
46/9
47/0
47/2
47/3
47/4
47/5
47/6
47/7
47/8
47/9
48/0
47/1
48/1
48/2
48/4
48/3
48/5
48/6
48/7
48/8
49/0
48/9
49/1
49/2
49/3
49/4
49/5
49/6
49/7
49/8
49/9
50/0
50/1
50/2
50/3
50/4
50/5
50/6
50/7
50/8
50/9
45/1
45
44/9
44/8
44/6
44/5
45/1
45/2
45/4
45/5
45/6
45/8
46/1
46/3
46/4
46/5
44/9
60/9
61/0
61/1 61/2 61/3 61/9
60/1
60/9
60/9
61/0
61/0
61/1
61/1
61/2
61/2
72/2
72/3
72/4
72/5
73/2
73/3
73/4
73/5
LP
LP
LP
62/162/2 62/3
62/462/5
62/6 62/7
62/8
62/9
60KM
61KM
62KM
63KM
LP
55/6
55/7
43/8
43/4
FH
BITUMINETERMINAL
PLANTATION
PLANTATION
PLANTATION
PLANTATION
27 Ø
T-25
14 Ø
11.5 Ø
CO
NT
AIN
ER
ST
AC
K Y
AR
D
12.90
TOP LVL OF OIL PIPE RACK
BITUMINE PAVEDO.S.Y-11
BITUMINE PAVED
O.S.Y-9
BITUMINE PAVED
OP
EN
AR
EA
ST
EE
L P
LA
TE
& P
IPE
ST
OR
AG
E
O.S.Y-9A
BITUMINE PAVED
BITUMINE PAVED
HM
PL P
IPE
LIN
E T
OW
AR
DS
SP
M
IOC
L P
IPE
LIN
E T
OW
AR
DS
SP
M
LNG SITE OFFICE
PLA
NTA
TIO
N
PLA
NTA
TIO
N
PLANTATION
PLANTATION
CC ROAD
DIESEL & PETROL TANK
9" PIPE LI
NE
LAND FALL POINT
CUTTING PILE POSITIONSHOWN WHIS IS VISIBLEDURING LOW TIDE MAY BE OTHERPILES ARE THERE IN THE WATER
60,000KL
ENCL-9
T-114
T-115
T-125
T-124
T-1226
T-128
T-127
T-116
T-118
T-117
T-119
ENCLOSURE-5
15000 KLT-102
15000 KLT-104
ENCLOSURE-7
T-57
T-59
T-58
T-52 T-51
15000 KL
T-108
15000 KL
T-106
T-56 T-55
ENCLOSURE-6
T-54 T-53
15000 KL
T-103
T-04
FR
15000 KLT-101
T-0218 ØFR
11.5 Ø
T-30
T-31
11.5 Ø
T-32
ENCLOSURE 2
T-19
T-20
T-21
18 Ø
T-42
18 Ø
18 Ø
15000 KL
T-10715000 KL
T-10518 Ø
T-07
T-08
18 Ø
T-06
(TYP)
18 Ø
T-36
11.5 Ø
14 Ø
T-26
14ØT-14
T-35
14 Ø
18 Ø
14 Ø
11.5 Ø
T-37
T-38
11.5 Ø
T-39
T-40
14 Ø
11.5 Ø
T-27
14 Ø
T-28
11.5 Ø
T-29
SLOP
T-47
T-48
SLOP
14Ø
14Ø
T-15
14ØT-16
T-17
14ØT-18
T-44
T-45
27 Ø
27 Ø
T-46
T-120
T-121
T-123
T-122
T-113
ENCLOSURE-4
T-43
T-0318 Ø
18 Ø
14ØT-12
T-13
(TYP.)
11.5 Ø
11.5 Ø
T-33
11.5 Ø
T-22
T-34
T-23
T-24
T-1014Ø
14ØT-11
T-41
27 Ø
T-05
ENCLOSURE 3
14Ø27 Ø
11.5 Ø
11.5 Ø
11.5 Ø
T-01 T-09
14Ø
22mtr.DIA X 14mtr.HT.
BITUMEN TANK-201
22mtr.DIA X 14mtr.HT.
TANK-202
BITUMEN 9.00mtr. HT.
TANK-203
8.00mtr.dia
BITUMEN
GARDEN
LIGHTING
FENCING WALL
LABOUR COLONY
NEW R
AILWAY
BUILDING N
R.
AIR S
TREAP
CHIMNEY
HA
RD
ST
AN
D
O.S
.Y-5
RAILWAY BU
ILDIN
G
BOUNDARY WALL
FIRE WALL
FIRE WALL
FIRE WALL HT. 0.6M
INSULATION JOINT
RUN WAY O
F AIR
STRIP
AIR S
TRIP
LAMELLA CLARIFIER
LAMELLA CLARIFIER
CABLE TRENCH
POLY DOSING
UNDER GROUND CABLE
COLUMN
3.5 MTR. HIGH STEEL STRUCTURE
3000 LTR. 3.0 HIGH
ROCK PAVED BUND
TRUCK/TRAILOR
PARKING AREA
TUG BERTH - 2
OUT GATE
WAY T
O M
ICT C
FS
ZERO POINT
JUNCTION
CA
US
EW
AY
TUG BERTH - 1
01
UPTO HERE ON PIPE CORRIDOR AND FROM HERE TO CTF U/G
ADANI POWER PLANT
GSB PAVED
O.S.Y-20RAIL
ING
HM
FIRE
FIRE
FIRE
FIRE
FIRE
FIRE
FIRE
FIRE
FIRE
FIRE
HM
FIRE
FIRE
FIRE
FIRE
FIRE
ADANI HOSPITALS
U/G OFC CABLE
MATERIAL STOCK YARD
MATERIAL STOCK YARD
MATERIAL STOCK YARD
BLACK CABLE
OPEN PLOT
LP
LP
CABLE TRENCH
CABLE TRENCH CABLE TRENCH CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH CABLE TRENCH
CABLE TRENCHCABLE TRENCH CABLE TRENCH CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TR
ENCHCABL
E TRENCH
CABLE TR
ENCH
CABLE TR
ENCH
CABLE TRE
NCH
CABLE TR
ENCHCABL
E TRENCH
CABLE TR
ENCH
MD
FIRE
FIRE
FIRE
SIGNAL POST
ROCK BUND
ROCK BUNDSEA SIDE EDGE
ROCK BUNDSEA SIDE EDGE
ROCK BUNDSEA SIDE EDGE
ROCK BUNDSEA SIDE EDGE
EX
IST
ING
BR
EA
KT
WA
TE
R
COMPOUND WALL
18M.Ø
T-4918M.Ø
FW TANK
FW TANK
T-50
PIPE
COR
RIDOR
CAR PARKING
LAWN
LAWN
LAW
N
LAWN
LAWN
LAWNLAWNLAWN
PLOT
BOUNDARY
COCONUT TREE
PAVED BLOCK ROAD
COCONUT TREE
COCONUT TREE
PAVED BLOCK ROAD
PAVED BLOCK ROAD
PAVED BLOCK ROAD
PAVE
D B
LOCK
RO
AD
WAY TO FOREST &ENVIRONMENT OFFICE
CABLE IN UNDERGROUND
NAVINAL STATION
BUILDING
MANGROVEHEGHT ABOVE 4.0 M
MANGROVEHEGHT ABOVE 4.0 M
MANGROVE
MANGROVE
MANGROVE
MANGROVE
MANGROVE
MANGROVE
INTAKE CHANNAL BRIDGE
Trelleborg Harbour Marinewww.harbourmarine.com
T-73
T-67
T-60T-64
KO
TA
DI R
OA
D B
RID
GE
KO
TA
DI R
AIL
BR
IDG
E
KO
TA
DI C
ON
VE
YO
R B
RID
GE
RA
ILW
AY
CA
BLE
T-78 T-79
ENCL 17 UNDER CONSTRUCTION
T-74
T-75
T-72
T-71
T-66 T-62
T-68
T-61T-65
T-70
T-63
T-69
DHRUB STATIONBUILDING
CABLE TRENCH
CABLE TRENCH
CONTAINER TERMINAL SOUTH BASIN
COCONUT PLANTATION
IN GATE
Trelleborg Harbour Marine www.harbourmarine.com
NAVINALBRIDGE
C C PAVED ROAD
C C PAVED ROAD
GSB AREA
GSB AREA
60
57
58
LIN
E N
O.5
LIN
E N
O.6
LIN
E N
O.4
LIN
E N
O.3
LIN
E N
O.2
LIN
E N
O.1
SP
HM
TRANSFORMER TRANSFORMER
WA
ND
H S
TE
EL
BR
IDG
E
WEST BASINRAILWAY STATION
01
7069
6867
6664
6563
6261
6059
5857
5655
5453
51 52
5049
4847
4645
4443
4241
4039
3837
3635
3433
3231
3028
2927
2624
2523
2221
1920
1817
1615
1413
1112
1009
0807
0605
0403
02
A
B
C
D
01
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
09
10
07
08
05
06
04
03
02
A
B
C
D
CARB WALL
1
2
3
X
Y
Z
MOORING DOLPHIN
3
1
4
2
6
5
7
9
11
8
10
14
13
12
16
15
18
17
21
20
19
22
23
25
24
26
27
29
28
30
32
31
35
33
36
34
37
42
39
38
43
40
41
44
45
46
48
47
49
50
51
52
54
53
55
56
59
61
RETAINING WALL
150T BOLLARD
MARKINGP/L WAY
POLE
PIPELI
NE MA
RKING
KP1
TLP7
AWL PIPE LINE
TLP8
TLP5
RC1
TLP6
PANEL
TLP2
PIPELINE
150T BOLLARD
150T BOLLARD
RAILWAY CABLE
1
2
3
5
6
7
8
9
10
11
1'
4
3''A1
3'A1
A
B
PILE CAPBEARM
PILE CAP
BEARM
PILE CAPBEARM
PILE CAP
BEARM
W 1
W 2
W 3
W 5
W 7
W 9
ROAD WIDENING ROAD WIDENING
FOOTPATH
FOOTPATH
FOOTPA
TH
FOOTPATHFOOTPATH
FOOTPATH
FOOTPA
TH
ROAD
53/6
53/7
53/8
53/9
54/0
54/1
54/2
59/5
59/6
59/7
59/9
60/0
2/9
2/8
2/6
2/5
06
05
04
03
06/6
06/4
06/2
06/0
05/8
05/6
05/4
05/2
05/0
04/8
04/6
04/2
04/0
03/8
03/6
03/2
03/0
LP
CURVENO. 19
CURVE
NO. 19
CURVENO. 18
CURVENO. 17
CURVENO. 20
CURVE
NO. 21
CURVE
NO. 16
CURVENO. 15
CURVENO. 10B
CURVENO. 20
TURNINGPOINT
TURNING
POINT
TURNINGPOINT
TURNINGPOINT
OFCSTONE
KM 02
BOX
KM 03
BOX
BOX
KM 02
WARNING
BORD
TURNING
POINT
KM 04
BOX
BOX
TURNING
POINT
KM 03
WARNING
BORD
TURNING
POINT
KM 05
BOX
BOXWARNINGBORD
WARNING
BORD
BOX
WARNING
BORD
WARNING
BORD
WARNING
BORD
TURNING
POINT
BOX WARNING
BORD
TURNING
POINT
TP '0'
ROUTEMARK
ROUTE
MARK
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
SB
HAND RAIL
HAND RAIL
STEEL PIPE
STEEL PIPE
STEEL PIPE
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAILHAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
HAND RAIL
EXP. JOINT
EXP. JOINT
EXP. JOINT
EXP. JOINT
EXP. JOINT
ATGPIPE
AS
HA
PU
RA
JE
TT
Y GMB PORT
OLD
MUNDRA
PORT JETTY
MULTIPURPOSE TERMINAL
CT - 2
MICT
T - 2
APPROCH-1
APPROCH-2
APPROCH-3
APPROACH-4
BE
RT
H-3
BE
RT
H-2
BE
RT
H-1
Trelleborg Harbour Marinewww.harbourmarine.com
Trelleborg Harbour Marinewww.harbourmarine.com
Trelleborg Harbour Marinewww.harbourmarine.com
www.harbourmarine.com
Trelleborg Harbour Marinewww.harbourmarine.com
Trelleborg Harbour Marinewww.harbourmarine.com
Trelleborg Harbour Marinewww.harbourmarine.com
Trelleborg Harbour Marinewww.harbourmarine.com
Trelleborg Harbour Marinewww.harbourmarine.com
Trelleborg Harbour Marine
PONTOON
LING SPAN BRIDGE
AIR COMPRESSOR PIPE
VENT PIPE
VENT
VENT
MARKING POLE
PIPELINE WARNING
PIPELINE WARNING
MARKING POLE
EX
IST
ING
IO
CL
PIP
EL
INE
PIPELINE MARKING
POLE
UN
DE
RG
RO
UN
D O
IL P
IPE
LIN
E
PIPE LINE TOWARDS IOCL
KP4
KP5
TLP3
MARKINGP/L WAY
MARKINGP/L WAY
MARKING
P/L WAY
WARNINGPIPELINE
WARNINGPIPELINE
WARNINGPIPELINE
PIPE
PIPE
MARKINGWARNING
MARKING
WARNING
MARKINGP/L WAY
KP3
TLP4
PANEL
TLP1
PIP
E L
INE
CO
RR
IDO
R
PIPELINES TO HPCL
3 x 24"
WARNING
PIPELINES TO HPCL3 x 24"
AWL PIPE LINE
HPCL PIPELINE
HPCL PIPELINE
HPCL PIPELINE
PIP
EL
INE
C
OR
RID
OR
PIP
EL
INE
C
OR
RID
OR
AW
L P
IPE
LIN
E
AWL PIPE LINEREST ON RCCPEDESTAL
AWL PIPE LINE REST ONRCC PEDESTAL BUT NOTVISABLE DUE TO FILLING
ADANI WIL
MAR O
IL P
IPE LIN
E
WIL
MA
R O
IL P
IPE
LIN
E
WILMAR OIL PIPE LINE
WIL
MA
R O
IL P
IPE L
INE
ADANI WILM
AR OIL PIPE LINE
U/G PIPE LINE
ROUTE SIGNAL
PIPELI
NE MA
RKING
PIPELIN
E MARK
ING
PIPELI
NE MARK
ING
PIP
ELIN
E W
AR
NIN
G
PIPE
LIN
E M
ARKI
NG
MA
RK
ING
PO
LE
PIP
ELIN
E 1
KM
PIP
ELIN
E M
AR
KIN
G
EX
IST
ING
IO
CL P
IPE
LIN
E
PIPE
LIN
E M
ARKI
NG
POLE
POLE
POLE
MA
RK
ING
PO
LE
PO
LEP
IPEL
INE
MA
RK
ING
PO
LEP
IPEL
INE
MA
RK
ING
POLE
PO
LE
POLE
HP
CL P
IPE
LIN
E C
OR
RID
OR
PIPE LINE CORRIDOR
PIP
E C
OR
RID
OR
PIP
E C
OR
RID
OR
PIPE
COR
RIDO
R
PIPE LINE CORRIDOR
PIP
E L
INE
CO
RR
IDO
R
PIPE C
ORRID
OR
CO
NV
. CO
RR
IDO
R &
OV
ER
HE
AD
PIP
E L
INE
CONV. CORRIDOR & OVER HEAD PIPE LINE
CONV. CORRIDOR & OVER HEAD PIPE LINE
CO
NV
. C
OR
RID
OR
& O
VE
R H
EA
D P
IPE
LIN
E
P/L WAY
VENT PIPE
WARNINGPIPELINE
PIPELINE CORRIDORMARKING
PIPELINE CORRIDOR
UNDER GROUND H
PCL PIP
ELINE
HMPL OIL PIPE LINE
HMPL OIL PIPE LINE
I.O.C.L. GENT PIPE
I.O.C.L. WENT PIPE
AD
AN
I WIL
MA
R P
IPE
LIN
E
ADANI WILMAR LINE
HPCL PIPE LINE CORRIDOR
PIPE CORRIDOR
PIPE CORRIDOR
PIPE
& FIR
E HYD
RANT
CORR
IDOR
PIPE CORRIDOR
LOOP
LOOP
7.23
7.18
7.32
7.43
7.25
7.2
7.22 7.22
7.2
7.17
7.18
7.05
7.09
7.23
HMPL OIL
HPCL OIL
7.18
7.19
7.19
7.2
VALVE
HMEL PIPELINE
4.0
CABLE LAYING
7.39
7.75
7.76
7.76
7.77
7.76
7.76
7.77
7.48
7.26
7.24
IOCL PIPE LINEAS SITE
VALVE
VALVE
VALVE
AWL PIPE LINE
HPCL LINE
TENTATIVE
HPCL PIP
E LINE C
ORRIDOR
LINE LOOP
OIL PIPELINE LOOP
OIL PIPE
EXISTING IOCL PIPE LINE
FIND BY LINE LOCATOR FROM IOCL
PIPE LINE CROSSINGWITHOUT CULVERT
PIPE LINE CROSSING
WITHOUT CULVERT
ROUTE SIGNAL
ELECTRIC PANEL &
FOUNDATION
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
ELCTRICAL BOX
PDB
PDB
ELE.BOX
ELE.BOX
ELE.BOX
ELE.BOX
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDBPDB
PDBPDB
PDB
PDB
PDBPDB
PDB PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDBPDBPDB
PDB
PDB
PDB
PDBPDB
PDB
PDB
PDB
PDBPDB
PDB PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
ELE. BOX
ELE. BOX
PDB
PDB
ELE.BOX
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
SWITCH BOX
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
TRANSFORMER
COMPACT SUB.STATION(CSS) NO.3
COMPACT SUB.STATION(CSS) NO.1
COMPACT SUB.
STATION(CSS) NO.2
COMPACT SUB.STATION(CSS)
COMPACT SUB.STATION(CSS)
TR
AN
SFO
RM
ER
S
FO
UN
DA
TIO
N
15 MVA TRANSFORMER 5 MVA TRANSFORMER
DG
TRANSFORMER
COMPACT SUB.STATION(CSS)
COMPACT SUB.STATION(CSS)
COMPACT SUB.STATION(CSS)
DG
DG
TRANSFORMER
TRANSFORMER
DG
DG
TOWER LIGHTTRANSFORMER
TRANSFORMER
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
SOLAR
LIGHTING POLE
SOLARLIGHTING POLE
SOLARLIGHTING POLE
SOLARLIGHTING POLE
ELECTRICALLIGHT POLE
ELECTRICALLIGHT POLE
LP
ELECTRICAL
LIGHT POLE
ELECTRICAL
LIGHT POLE
ELECTRICALLIGHT POLE ELECTRICALLIGHT POLE
ELECTRICAL
LIGHT POLE
ELECTRICALLIGHT POLE
SRJ
TROLLYREFUGE
TROLLYREFUGE
TROLLYREFUGE
NO:119A
NO:118A
NO:117A
NO:116A
NO:115A
NO:114A
NO:113A
NO:112A
NO:111A
NO:110A
NO:109A
NO:108A
NO:107A
NO:106ANO:105A
NO:104A
NO:103A
NO:102A
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TRENCH
CABLE TR
ENCH
CABLE TRACK
CABLE TRACK
OFC CABLE
ROUTE IS NOT CLEAR CABLE
MARKER IS NOT AVAILABLE AT SITE
LP
LP
LP
LP
LP
LP
LP
LP
LT
HM
HM
HM
HM
HM
HM
LT
HM 6
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
COMMUNICATIONTOWER
CABIN
CABIN
HM
LT
HM 7
HM 5
HM 4
HM 3
HM 2
HM 1
LT
LT
LT
LTLT
LIGHTINGTOWER
COMMU. TOWER
HM
LT
LTLT
VIEW POINT
BREAK WATER
LIGHT POLE
COMMUNICATIONTOWER
LT
HM
HM
HM
LT
LT
LT
HM
LIGHT TOWER
LT
LT
LT
COMMU. TOWER
LT
LT
LT
LT
LT
LT
LIGHTTOWER
LTLT
LT
HM FOUNDATION
LT
LT
TOWER
LT
LT
LTLT
LT
LEADING LIGHT TOWER
HM
HM
LT
LT
LT
LTLT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LEADING LIGHT
TOWER
LEADING LIGHT
TOWER
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
LIGHTING
TOWER
LT
LT
LT
LT
LT
LT
LT
LEADING LIGHT TOWER
LT
GSB
RAM
P
W
W
W
W
DYKE WALL
VALVE
AIR VALVE
AIR VALVE NO= 10
WATER FILLING STATION
W
W
WW
W
W
W
W
W
W
W W
W
W
W
W
W
W
W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W WW
W
W
W
W
W
WWW
W WWW
W
W W
W
W
WW
W
W
W
W
W
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVEVALVEVALVEVALVE
VALVE
VALVEVALVE
VALVE
VALVE
VALVE VALVE
SV
SV
VALVE
VALVE
VALVEVALVE
W
W
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
VALVE
SV
SV
BIT
UM
IN P
AV
ED
PARKING AREA
I-Row
J-Row
C ROW COAL STACK YARD
G ROW COAL STACK YARD
H ROW COAL STACK YARD
F ROW COAL STACK YARDE ROW COAL STACK YARD
D ROW COAL STACK YARD
AR
EA
US
ED
BY
ME
CH
AN
ICA
L ,H
OT
MIX
PL
AN
T A
ND
BL
OC
K M
AK
ER
PL
AN
T
ROW MATERIALSTOCK YARD FORWMM PLANT
ROW MATERIALSTOCK YARD FORBETCHING PLANT
ROW MATERIALSTOCK YARD FORSAND SKIN PLANT
ROW MATERIALSTOCK YARD
ROW MATERIALSTOCK YARD PB-02
BLOCK STACKYARD FOR PB-01
ROW MATERIALSTOCK YARD PB-01
ROW MATERIALSTOCK YARD FORHOT MIX PLANT
RAMP
BLOCK STACKYARD FOR PB
PLA
NTA
TION
PLAN
TATIO
N
TREES
TREES
TREES
COCONUTSTREES
COCONUTSTREES
COCONUTSTREES
COCONUTS
TREES
COCONUTSTREES
COCONUTS
TREES
COCONUTSTREES
COCONUTSTREES
COCONUTS
TREES
COCONUTSTREES
COCONUTS
TREES
TREE LINE
TREE LINE
TREE LINE
COCONUTSTREES
PLANTATION
PLANTATION
PLAN
TATIO
N
TREES
TREES
TREES
DRC LAND
DRC LAND
TREE LINE
TREE LINE
TREES
TREES
FLOWER PORTSOF CONCRITE
W.M.M. PAVED
UN PAVED
UN
PAV
ED
UN PAVED
WELL
WELL
RA
ILW
AY
LIN
E
HM 12W
PDB
PDB
W
VALVE
FENCE
PETROLPUMP
DAMAGE FENCE
PDB
COMPACT SUB.STATION(CSS)
HM
W
VALVE
W
VALVE
BITUMIN PAVEDPLANTATION
TREE
LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE TREE LINE
TREE LINEPLANTATIONPLANTATION
TREE LINE TREE LINE
HM
HM
COMMU. TOWER
COMMU. TOWER
COMMU. TOWER
COMMU. TOWERHM
HM
HM
HM
PDB 1
PDB 2
PILE
PLA
NT
AT
ION
PLA
NT
AT
ION
COMPACT SUB.STATION(CSS)
LEADLINETOWER
PDB
PDB
LEADLINETOWER
DREDGING CHANNLE
ONLY POLE
MIKE CABLE
MIKE CABLE
MIKE CA
BLE
HM
SP
SP
SP
SP
CB
CB
CB
PDB
PDB
EXPANSIONJOINT
EXPANSIONJOINT
BE
RT
H-4
APPROACH-5
EXPANSION JOINT
EXPANSION JOINT
TRANSFORMERRMU
COMPACT SUB.
STATION(CSS)
GSB AREA
VALVE
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINACONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
CONCERTINA
LP
COMPACT SUB.STATION(CSS)
RE
CL
AM
AT
ION
AR
EA
EXISTING BUND
LTLTLTLTLT
W W
W
PETROL PUMP
W W
WATER PUMP STATION
ELE. LIGHT POLE
CONCERTINA
CO
NC
ER
TIN
A
CO
NC
ER
TIN
A
PLA
NT
AT
ION
PLA
NT
AT
ION
PLANTATION
PLANTATION
COMMUNICATIONTOWER
BIT
UM
INE
PA
VE
D
BITUMINE PAVED
BITUMINE PAVEDPDB
PARKING AREA
DSS
DSS
DSS
DSS
FFS
W
PDB
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
W
W
W
GSB PLOT
PDB
HM
PDB
HM
PDB
HM
PDB
HM
COMPACT SUB.
STATION(CSS)
HM
PCC ROAD
AIR
AN
D W
AT
ER
PIP
E A
TT
2 S
TR
UC
TU
RE
TO
P T
O A
TT
4
AIR
AN
D W
AT
ER
PIP
E A
TT
4 S
TR
UC
TU
RE
TO
P T
O A
TT
10
AIR AND WATER PIPE ARD 1 STRUCTURE TOP TO ATT 10
Fire pipe
PLA
NT
AT
ION
PVC IRRIGATION WATER PIPE LINE U/G
HM
HM
W
W
W
W
W
W
W
W
W
W
W
PVC IRRIGATION WATER PIPE LINE U/G
PVC IRRIGATION WATER PIPE LINE U/G
LT
COMMUNICATIONTOWER
ROCK BUND
ROCK BUND
PDB
GSB PLOT
COMMUNICATIONTOWER
COMMUNICATION
TOWER
HM
HM
PDB
GSB PAVED AREA
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
PDB
COMPACT SUB.
STATION(CSS)
GSB AREA
GSB AREA
GSB AREA
GSB AREA
GSB PLOT
GSB
PLO
T
GSB AREA
GSB AREA
GSB AREA
HM
HM
HM-2HM-1 HM-3 HM-4 HM-5 HM-6
HM-11
HM-18HM-17
HM-12
HM-8HM-7 HM-9 HM-10
HM-27
HM-21
CSS-7
CSS-14
CSS-2
CSS-3CSS-11HM-24HM-23
HM-19 HM-20
HM-15
HM-25CSS-9 CSS-10 CSS-6
CSS-5
CSS-1
HM-1
HM-16
HM-22
HM-14HM-13
HM-0
VC
AV
CHIMNEY
COMPACT SUB.
STATION(CSS-8)
COMPACT SUB.STATION(CSS-13) COMPACT SUB.
COMPACT SUB.
COMPACT SUB.HM-26
59/7
59/8
59/9
60/2
60/3
60/4
60/5
60/6
60/7
60/8
60/9
61/0
61/1
61/2
61/3
SB
PDB
HM
COCONUT TREE PLANTATION
COCONUT TREE PLANTATION
CO
CO
NU
T T
RE
E P
LA
NT
AT
ION
LAMP POST
WATER TANK
DUST
SUR
FACE
TION
SYST
EM P
IPE
HYDRANT
HYDRANT
APPROX PIPE DEPTH:-1.50 MTR.
HYDRANT
FIRE HYDRANT
RAMP
EXISTING EMPTYCONTAINER YARDENCROACHMENT
EXISTING EMPTYCONTAINER YARD
FENCING
BLOCK STACKYARD FOR PB
BARREL
YARD
PIP
E S
TA
CK
ING
YA
RD
(STORE-DREDGING )
SCRAP YARD
LUB OIL STORAGE
OPEN STORE YARD
OLD
FEN
CIN
GN
EW
FE
NC
ING
HAND
RAILING
HANDRAILING
HAND
RAILING
HAND
RAILING
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
SEZ BOUNDARY & FENCING
FENCE
FENCE
VALVE
MRSS
WASTE
STORGE
ONLY CEMENT POLE
WIRE FENCING
WIRE FENCING
WIRE FENCING
WIRE FENCE
WIRE FENCING
WIRE FENCING
WIRE FENCING
FENCE
FENCE
AP
SE
Z R
AIL
WA
Y S
LIP
PE
R S
TO
CK
YA
RD
MATERIAL STOCK YARD
FENCE
FENCE
FENCE
FENCE
FENCE
FEN
CE
DAMAGE
'T' JUNCTION
DAMAGE
COMMUNICATIONTOWER
MARUTIYARDAREA
FENCIN
G
FENCIN
G
FE
NC
ING
FE
NC
ING
FE
NC
ING
FENCING
FENCIN
G
FENCIN
G
FENCING
FE
NC
ING
FE
NC
ING
FE
NC
ING
PRECAST WALL
DG HOUSE
YARD
RABARI WANDH
CREMATORIUM
WIR
E FENCIN
G
WIRE FENCING
WIR
E F
EN
CIN
G
WIR
E F
EN
CIN
G
WIR
E F
EN
CIN
G
FE
NC
E
MARSHYAREA
MARSHYAREA
MARSHYAREA
PLANTATION
PLANTATION
PLANTATION
PLANTATI
ON
PL
AN
TA
TIO
N
PLANTATION
PLANTATION
PLANTATION
PLANTATIONPLANTATION
PLANTATION
PLANTATION
PLANTA
TION
PLANTATION
TREE LINE
GREEN BELT
GREEN BELT
GREEN BELT
GREEN BELT GREEN BELT
GREEN BELT GREEN BELT
GREEN BELT
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTA
TION
PLANTA
TION
PLANTA
TION
PLANTA
TION
PLANTA
TION
PLANTATI
ON
PLANTATION
PLANTATION
PLANTATION
GA
RD
EN
GREEN BELT
GREEN
BELT
GREEN
BELT
GREEN
BELT
GREEN
BELT
GREEN
BELT
GREEN
BELT
GREEN
BELT
GREEN
BELT
GREEN BELT
GREEN
BELT
GREEN BELT
GREEN BELT
GREEN
BELT
GREEN
BELT
GREEN
BELT
GREEN
BELT
PLANTATION
PLANTATION
PLANTATION
GREEN B
ELT
GREE
N B
ELT
GREEN B
ELT
PLANTATION
GARDEN
PLANTATION
GARD
EN
PLANT
ATION
GABIA
N W
ALL
BREAK WATER
ROCK
BUND
EX
IST
ING
BR
EA
K W
AT
ER
EXISTING BREAK WATER
ROCK BUNDSEA SIDE EDGE
ROCK BUND
BREAKWATER
ROCK TOE LINE
ROCK BUND
ROCK BUND
SIGNAL POST
W
W
W
FFS
LIN
E N
O :-
09
LIN
E N
O :-
10
LIN
E N
O :-
11
LIN
E N
O :-
12
LIN
E N
O :-
09
LIN
E N
O :-
10
LIN
E N
O :-
11
LIN
E N
O :-
12
LIN
E N
O :-
01
LIN
E N
O :-
04
LIN
E N
O :-
05
LIN
E N
O :-
06
LIN
E N
O :-
07
LIN
E N
O :-0
8
LIN
E N
O :-0
1
LIN
E N
O :-
04
LIN
E N
O :-
05
LIN
E N
O :-
06
LIN
E N
O :-0
7
LIN
E N
O :-
08
LINE NO-7
LINE NO-6
LINE NO-4
LINE NO-5
LINE NO-3
LINE NO-2
LINE NO-1
LINE NO-00
LINE NO-0
RAILWAY CABLE
RAILWAY CABLE
RAILWAY CABLE
SINGNAL
POST
SINGNALPOST
SINGNALPOST
COMMUNICATIONBOX
SINGNALPOST
SINGNALPOST
SINGNALPOST
SINGNAL
POST
COMMUNICATION
BOX
SIGNAL POST
SIGNALPOST
COMUNICATION BOX
COMMUNICATION BOX
COMMUNICATION BOX
COMMUNICATION BOX
COMUNICATION BOX
SP
COMUNICATION BOX
COMMUNICATIONBOX
SP
COMMUNICATION
BOX
SIGNAL POST
SIGNAL POST
COMMUNICATION
BOX
COMMUNICATIONBOX
COMMUNICATIONBOX
SIGNAL POST
COMMUNICATIONBOX
COMMUNICATIONBOX
COMMUNICATIONBOX
SIGNAL POST
COMMUNICATION
BOX
COMMUNICATIONBOX
COMMUNICATION
BOX
COMMUNICATIONBOX
COMMUNICATIONBOX
COMMU. BOX
RAILWAY CABLE
COMMUNICATIONBOX
SIGNAL POST
COMMUNICATION
BOX
SP
RAILWAY CABLE
SIGNAL POST
SIGNAL POST
SIGNAL POST
COMMUNICATIONBOX
COMMUNICATION
BOX
COMMUNICATIONBOX
COMMUNICATION
BOX
COMMUNICATION
BOX
COMMUNICATIONBOX
COMMUNICATION
BOX
COMMUNICATION
BOX
COMMUNIC
ATION BOX
COMMUNICATION
BOX
COMMUNICATIONBOX
COMMUNICATIONBOX
CB
SP
SP
SINGNAL
POST
SINGNALPOST
SINGNALPOST
COMMUNICATIONBOX
COMMUNICATIONBOX
COMMUNICATIONBOX
RLY LT CABLE
COMMUNICATION
BOX
COMMUNICATION
BOX
COMMUNICATIONBOX
COMMUNICATION
BOX
SIGNAL POST
SIGNAL POST
COMMUNICATION
BOX
SIGNAL POST
COMMUNICATION
BOX
SINGAL POST
SITTING
PAID
C C PAVED ROAD
C C PAVED ROAD
C C PAVED ROAD
C C PAVED ROADC C PAVED ROAD
C C PAVED ROAD
C C PAVED ROAD
RO
AD
CC ROAD
BLOCK
PAVEDROAD
C C PAVED ROAD
C C
PAVEDROAD
C CPAVED
ROAD
BLOCKPAVED
ROAD
BLOCKPAVED
ROAD
BLOCKPAVED
ROAD
C C
PAVEDROAD
C CPAVED
ROAD
BLOCKPAVED
ROAD
W
HM
RAILWAY BUILDING
COAL STOCK
FIRE WATER PIPE
METERROOM
O.S.Y. 1
STONE PITCHING
STONE PITCHING
STONE PITCHING
W
W
W
VALVE
BOX
BORDWARNING
PDB
DG
DG
COMMUNICATIONTOWER
COMMUNICATIONTOWER
WW
WW
W
WATER TANK
COVER
COVER
DG
FFS
LT
FENCING DAMAGE
HM
HM
FENCING DAMAGE
WARNING
BORD
WARNING
BORD
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPLHMPL
HMPL
HMPL
HMPLHMPL
HMPL HMPL
HMPLHMPL
HMPLHMPL
HMPLHMPL
HMPL
HMPL
HMPLHMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPLHMPL
HMPL
HMPL
HMPL HMPL
HMPL HMPL
HMPL
HMPL
HMPL HMPL
HMPLHMPL
HMPLHMPL
HMPLHMPL
HMPLHMPL
HMPLHMPL
HMPL
HMPL
HMPLHMPL
HMPLHMPL
HMPLHMPL
HMPLHMPL
HMPL
HMPL
HMPLHMPL
HMPLHMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPLHMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPLHMPL
HMPLHMPL
PDB
PDB
PDB
CONCERTINA
CONCERTINA
CSS
GREEN BELT
GREEN BELT
GREEN BELT
GREEN BELT
COCONUTSTREES
COCONUTS
TREES
COCONUTS
TREES
COCONUTS
TREES
COCONUTS
TREES
COCONUTS
TREES
VALVE
LE
VE
L M
AY
VE
RY
DU
E T
O S
HIF
TIN
G O
F S
OIL
CRAS
H BAR
RIER
CRASH BARRIER
GABION LAID
AREA
GABION WALL
GABION WALL
GABION WALL
GABION WALL
EFFLUENT CHANNEL BRIDGE
GABION WALL
GABION WALL
GABION WALL
GABION WALL
GABION WALL
GABION
WALL
GABION
WALL
GABION WALL
GABION WALL
GABION WALL
GABION
WALL
GABION
WALL
GABION L
AID A
REA
COMMUNICATIONBOX
BO
UN
DA
RY
WA
LL
BOUNDARY WALL
THRESHOLD 23
BOUNDARY WALL
RAMP
RAMP
GSB PARKING AREA
MAJORBRIDGE
BOUNDARY WALL
BOUNDARY WALL
BO
UN
DA
RY
WA
LL
ASHUTO
SH CFS
COMMU. TOWER
W
COMMUNICATIONTOWER
RE
CL
AIM
ED
AR
EA
CONCERTINA
HM
COMMU. TOWERCOMMU.TOWER
HM
PDBHM
PDB
SB
SB
SINGNAL
POST
PDB
COLUMN COLUMN
COLUMN COLUMN
COLUMN
COLUMN COLUMN COLUMN
HM
GABION WALL
HM
AIR VALVE
W
GS
B P
LO
T
W
FENCE
BOX
BOXBOX
BOX
ROUTE
MARK
WORNING
BORD
HMPL
BOX
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPLHMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL
HMPL CORRIDOR
HM
PL C
OR
RID
OR
HMPL CORRIDOR
HMPL C
ORRIDOR
COMMU. BOX
COMMU. BOX
COMMU. BOX
COMMU.BOX
COMMU. BOX
COMMU. BOX
SIGNALPOST
COMMU. BOX
COMMU. BOX
COMMU. BOXSIGNAL
POST
SIGNAL
POST
COMMU. BOX
COMMU. BOX
SIGNAL
POST
CO
MM
U. B
OX
COMMU.BOX
COMMU.
BOX
SIGNAL
POST
COMMU.BOX
COMMU.BOX
COMMU.BOX
SB
COMMU. BOX
COMMU. BOX
COMMU. BOX
COMMU. BOX
COMMU. BOX
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
OPEN
GATE
GSB
PLO
T
GSB
PLO
T
COCONUTS
TREES
COCONUTSTREES
COCONUTSTREES
LC
LC
AIR VALVE
W
AIR VALVE
AIR VALVE
AIR VALVE
AIR VALVE
AIR VALVE
AIR VALVE
W
W
W
W
W
W
SLUICE VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
AIR VALVE
AIR VALVE
AIR VALVE
SLUICE VALVE
W
W
W
W
W
AIR VALVE
W
W
SLUICE VALVE
W
AIR VALVE
SLUICE VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
W
AIR VALVE
W
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
SLUICE VALVE
SLUICE VALVE
SLUICE VALVE
W
SLUICE VALVE
W
SLUICE VALVE
W
W
SLUICE VALVE
AIR VALVE
W
AIR VALVE
W
SLUICE VALVE
W
AIR VALVE
W
SLUICE VALVE
W
W
AIR VALVE
W
AIR VALVE
W
SLUICE VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVEW
SHANTIDWAR PARKING
DG
COCONUTS
TREES
VALVE
W
TRANSFORMER
TRAN
SFO
RMER
TRAN
SFO
RMER
TRANS
FORM
ER
TRANSF
ORMER
TRANSFORMER
TRANSFORMER
TR
AN
SF
OR
ME
R
HM
IT TOWER
TO NANA KAPAYA
TO
SH
AN
TIV
AN
TO BORANA
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
TRANSFORMER
FORBES GOKAKMUNDHRA CFS
CWC CFS
PLOT FOR
IOCL
ALL CARGO
TR
AN
S W
OR
LD
SAURASHTRA CFSHONECOMB
LOGISTICS
SEA BIRD MARINE
GLOBAL
HPCL G G S R L
WTP AREA
AVESTA PLOT
EMPEZAR
LOGESTICS
I T I
CGPL CORRIDOR
GIDCCGPL CORRIDOR CGPL CORRIDOR
CG
PL C
OR
RID
OR
CG
PL C
OR
RID
OR
CG
PL C
OR
RID
OR
CG
PL C
OR
RID
OR
CG
PL C
OR
RID
OR
CG
PL C
OR
RID
OR
CG
PL
CO
RR
IDO
R
CGPL AREA
CGPL AREA
CG
PL C
OR
RID
OR
BHARATFORGE
OCCL
DORFKETAL
AADI OIL
TERRAMGEOSYNTHETICS
PVT. LTD.
AHLSTROMFIBER COMPOSITES
INDIA PVT LTD
SKAPSINDUSTRIES
INDIA PVT LTD
ANJANI UDYOGPVT LTD
66 KV SUB
STATION
ASHAPURAGARMENTS LTD
THERMEX
LTD. - 2
OILFIELD
WAREHOUSE
SERVICESPVT. LTD.
THERMEX
LTD. -1
ANUPAM-MHI INDUSTRIES LTD
CWC W
AREHOUSE
MICT CFS
HM
W
SCRAP YARD
SWITCH
YARD
OLD
NEW
OLD
NEW
U/G CABLE
W
PDB
COCONUTSTREES
COCONUTS
TREES
COCONUTSTREES
COCONUTS
TREES
COCONUTSTREES
COCONUTS
TREES
FOUNDATION
BOU
ND
ARY
WAL
L
BOUNDARY WALL
OU
T G
AT
E
IN G
AT
E
AIR VALVE
W
CRASH BARRIER
CRAS
H BAR
RIER
CRASH BARRIER
W
AIR VALVE
W
AIR VALVE
W
VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
AIR VALVE
W
PIPELINE 300Ømm
AIR VALVE
W
PIPELINE 350Ømm
AIR VALVEPIPELINE 300Ømm
AIR VALVEPIPELINE 350Ømm
W
PDB
IOCL CORRIDORPILLAR
BREAK WATERWASHOUT
CRASH BARRIER
CRASH BARRIER
TREE LINE
TREE LINE
TREE LINE
ECO PARK
R.C.C.ROAD
W
HM HM
HM
HM HM
HM
HM
W
W
W
PIPEL
INE UN
DER G
ROUN
D
PIPELINE UNDER GROUND
PIPEL
INE UN
DER G
ROUN
D
LP
LP
LP LP LP LP LP LP LP LP
LP
LP
LP
LP LPLPLP
LP
LP
LP
DYKE WALL
DYKE WALL
FIRE BOX
FIRE BOX
FIRE BOX
FIRE BOX
FH
FH
FH
FH
FH
FH
FH
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
STEEL BRIDGE
DG
GS
B P
LO
T
FIRE HYDRANT
FIRE HYDRANT
LT
W
W
W
VALVE
VALVE
W
SLUICE VALVE
BITUMINE PAVED
GSB PARKING AREA
GSB PARKING AREA
GSB PARKING AREA
GSB PARKING AREA
BLOCK PAVED ROAD
BLOCK PAVED ROAD
BLO
CK
PA
VED
RO
AD
BLO
CK
PA
VED
RO
AD
RAILING
ENCLOSURE 1
W
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATIONFOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATIONFOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATIONFOUNDATION
TANK
FOUNDATIONTANK
FOUNDATION
HM PDB
L ROW COAL STACK YARDK ROW COAL STACK YARD
W
8.06
8.05
FFS LINE 150Ø
FFS LINE JOINT
RAILING
W
W
OIL PIPELINE 12"OIL PIPELINE 8"
PDB
COMPACT SUB.STATION(CSS)
CT-4
A
B
C
D
E
ROCK BUND
MOORING DOLPHIN
PDB
PDB
PDB
GIDC
GIDC
W
W
W
W
MOBILE
TOWER
COMMUN
ICATION
BOX
RAILWAYDEAD END
RAILWAYDEAD END
COMMUN
ICATION B
OX
SP
SP
COMMUN
ICATION B
OX
SP
COMMUNIC
ATION BOX
SP
SPSB
SP
CB
SP
SPSP
COMMUNICATION BOX
COMMUNICATION BOX
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
COMMUN
ICATIO
N BOX
COMMU. BOX
COMMUNIC
ATION BOX
59/4
59/6
SP
SP
COMMU.
BOX
SB
SB
SB
COMMU.BOX
COMMU.
BOX
SP
COMMU.
BOX
COMMU.BOX
SP
SP
COMMU.BOX
DG
COMMUNICATIONTOWER
SECURITY
CONTROL
ROOM
9KM
CRASH BARRIER
KM 8
C.C
.RO
AD
KM 7
KM 6
CRASH BARRIER
CRASH BARRIER
CRASH BARRIER
Well
Well
SECURITYTOWER
DG
DG
W
VALVE & METER
SP
SB
SB
SB
CB
CBCB
CB
CB
CBCB
CB
SB
CB
SB
SBSB
SB
SB
SBSBSB
SB
SB
COMMUNICATIONTOWER
DG
CB
CB
SB
SB
CB
TREE LINE
TREE LINE
CBCB
CB
CB
CB
CB
CB
SB
SB
CB
CB
CB
CBCB
CB
CBCB
CB
CB
CB
CB
CB
CB
CB
SP
CB
SP
SP
CB
SP
SP
CB
CB
SP
CB
CB
CB
SP
CB
CB
CB
CB
CB
SPSP
CB
CB
SP
SP
SP
SP
SP
SP
CB
APPROX U/G RAILWAY CABLE
CB
CBCB
COMMU. BOX
CBCB SP
COMPACT SUB.STATION(CSS)
SB
SB
SB
CBSPCB
SB
60/4
60/5
60/6
60/7
60/8
61/4 61/5 61/6 61/7 61/8
59/9
60/2
60/3
60/4
60/4
60/5
60/5
60/6
60/6
60/7
60/7
60/8
60/8
61/3
61/3
61/4
61/4
61/5
61/5
61/6
61/6
61/7
61/7
SP
COMMUNICATIONBOX
SP
COMMU. BOX
CB
CB
PDB
SP
SP
SP
SPCB
CBSP
CB
SP
COMMUNICATION
BOX
VALVE
FUEL
TAN
K LI
NE
CB
CB
CBCB
SP
CB
CB
CB
CB
CB
SPSP
DIES
EL P
IPEL
INE
SP
COMM
U. BO
X
SPSP
SP
SP
SP
CB
CB
CB
SP
SB
SB
EP
EP
COMMU.
BOX
LN
G U
ND
ER
CO
NS
TR
UC
TIO
N
COMM.
TOWER
PDB
PDB
PDB
GATE
COMMUNICATIONTOWER
RAMPRAMP
OIL & FIRE PIPELINE
EMPTY CONTAINER YARD
HM
COMMUNICATION TOWER
PDB
W
VALVE
W
VALVE
WVALVE
W
VALVE
WVALVE
COMMUNICATION
TOWER
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
DG
HM
DG
LP
TOWER
DG
DVORBUILDING
COMMU. TOWER
COMMU. TOWER
AS PER INSTRUCTIONBY BSNL OFFICER (MR.MEENA)
AS PER INSTRUCTIONBY BSNL OFFICER (MR.MEENA)
HUME PIPE 600Ø
W
VALVEMETER
W
S. VALVE 350MM Ø
TREE LINE
TREE LINE
TREE LINE
HMPDB
HM
PDB
EXPANSIONJOINT
EXPA
NSION
JOINT
PDB
PDB
BOLLARD
QRH
QRH
QRH
QRH
QRH
QRH
BOLLARD
BOLLARD
BOLLARD
BOLLARD
BOLLARD
BOLLARD
BOLLARD
BOLLARD
QRH
PDB
HM
VALVEMETER
FAST TRACK
N ROW COAL STACK YARD
O ROW COAL STACK YARD
GSB PAVED
GS
B A
PP
RO
CH
RO
AD
G.S
.B A
PP
RO
CH
RO
AD
PDB
PDB
PDB
PDB
PDB
PDB
PDB
COMMU. TOWER
PLA
NTA
TIO
N
PLA
NT
AT
ION
PLA
NT
AT
ION
PLA
NTA
TIO
N
PLA
NTA
TIO
N
PLA
NTA
TIO
N
PLA
NTA
TIO
N
PLA
NT
AT
ION
PLA
NT
AT
ION
PLA
NTA
TIO
N
PLA
NT
AT
ION
HM
HM
HM
HM
HM
HM
HM
HM
W
DG
PLANTATION
PLANTATION
DG
PDB
LT
FH FH FH
FHFH
FH
FH
FH
CB
CB
CB
CB
CB
CB
CB
CB CB
CB
CB
CB
SP
SP
SP
SP
SP
SP
SB
SB
SB
SB
SB
LIN
E N
O :-
13
MSW PLOT
CC ROAD
CC ROAD
MOBILETOWER
HM
CB
CB
CB
SP
CB
CB
CB
CBCB
SPSP
CB
SP
CB
CB
CB
CB
SB
SB
CB
SB
LOOP
BOUNDARY WALL
PLA
NT
AT
ION
MOBILETOWER
W
DUMMY PILE
STEEL ROAD
EXISTING LOAD
TEST PILE
ROCK BUND
ELECTRIC CABLE
LP
LP
PDB
PORTA CABIN
HM
SCRAP YARD
LT
LT
L&T MATERIAL YARD
LOAD OUT JETTY
STEEL PIILE STOCK YARD
STEEL PILE FABRICATION YARD
STEEL PILE PAINTING YARD
PRECAST YARD
CR
OS
S G
AN
TR
Y
FABRICATION YARD
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
7.137.15
7.27.137.137.23
7.097.02
7 6.987.1 6.93
7.06
TRAILER MAINTENANCE
VALVEWW
ROCK STOCK AREA
ROCK STOCK AREA
CHECK RAIL TOP LEVEL
PDB
LP
PDB
PIPE
COR
RIDOR
PIPELINE U/G PIPELINE U/G
PIPELINE U/G PIPELINE U/G
CONTAINER STOCK YARD
CO
NT
AIN
ER
ST
OC
K Y
AR
D
HM
TREE LINE
TREE LINES
TREE LINE
HM
TREE LINES
TREE LINES
TREE LINES
TREE LINES
TREE LINES
TREE LINES
TREE LINES
PDB
PDB
IN GATE
OUT GATE
UNDER GROUND CABLE
TR
EE LIN
ES
TREE LINES
TREE LINES
TREE LINES
TR
EE
LIN
ES
TREE LINES
SEWAGE PIPELINE AS PER EXECUTION DRAWING
SEWAGE PIPELINE AS PER EXECUTION DRAWING
SEWAG
E PIPE
LINE A
S PER
EXEC
UTION
DRAW
ING
VERTICAL LOOP
VERTICAL LOOP
VERTICAL LOOP
TOWERCOMMUNICATION
PDB
HM
LTLT
TREE LINE
TREE LINE
TREE LINE
TREE LINE
8"/16" BITUMEN PIPE
8"/16" BITUMEN PIPE
8"/16" BITUMEN PIPE
LP
LP LP LP LP
LP
LP LP LP LP
LP
LP LP LP
LP
LP
LPTREE LINE TREE LINE
YARD
PDB
HYDRANTFIRE BOX
HYDRANTFIRE BOX
HYDRANTFIRE BOX
HYDRANT
FIRE BOXHYDRANT
FIRE BOX
HYDRANT
FIRE BOX
HYDRANT
FIRE BOXHYDRANTFIRE BOX
HYDRANTFIRE BOX
HYDRANT
FIRE BOX
FIRE BOX
BORE PIPE
PDB
PDB
PIPE CORRIDOR
PIPE CORRIDOR
PIPE CORRIDORPIPE CORRIDOR
PIPE RACK
PIPE RACK
PIPE RACK
TANK
NEEM OIL TANK
COMMU. TOWER
TREE LINE
TREE LINE
TREE LINE
TREE
LINE
TREE LINE
TREE LINE
TREE
LINE
TREE
LINE
TREE
LINE
TREE LINE
TREE
LINE
TREE LINE
FIRE BOXFH
FIRE BOXFH
FIRE BOX
FH
FIRE BOXFH
FIRE BOXFH
WW
W UNDER GROUND BOX BOX
FHFH
FH
FHBOX
FHBOX
FHBOX
FHBOX
FH
BOX
FHBOX FHBOX FHBOX
FH
BOX
FH
BOX
FHBOX
FH BOX
FH BOX
FH BOX
FHBOX
FH
BOX
FHBOX
FHBOX
FH BOX
FH BOX
PDB
PDB
PDB
PDB
PARKINGPARKING
BOX
BITUMINE PAVED
PLANTATION
VALVE
VALVEW
GSB PARKING GSB PARKING
PDB
PDB
COMMUNICATIONTOWER
SAURASHTRA CFS
EMPTY CONTAINER YARD
PDB
TRANS WORLD CFS
EMPTY CONTAINER YARD
COMM. TOWER
PDB
OC
CL
PA
RT-
2
AREA 25 ACER AREA 25+4.97=29.97 ACER
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE
CHIMNEY CHIMNEY
CHIMNEY
W
STEINWEG(25.00 acres)
GURGE TUBE
BITUMINE PAVED
BITUMINE PAVED
HM
TR
EE
LIN
E
TR
EE
LIN
E
TREE LINE
TREE LINE
OILFIELDWAREHOUSE
SERVICES
PVT. LTD.PART-1 PART-2
CONCERTINA
W
LT ARRESTER
TOWER
PDB
MASK
LT ARRESTER
LT ARRESTER
LP
LPLP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
W
CRICKET PLAY GROUND
NURSERY
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
SECURITY
PARADE GROUND
PDB
CRASH BARRIER
W
TREE LINE
CSS
HM
CSS
CSS
STEP
GATE
PDB
TREE LINE
TREE LINE
W
Ø300(U/G)
HM 8
RAILI
NG
M ROW COAL STACK YARD
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
LPG LIMIT
LPG LIMIT
RAILIN
G
HM-3 HM-4
HM-06
HM-05
HM-09 HM-10
CSS-09
CSS-10
CSS-08
HM-02HM-01
HM-07 HM-08
HM-14
CSS-01
CSS-02CSS-03
CSS-04
CSS-07CSS-06CSS-05 HM-13
HM-12
RO
CK
BA
ND
HM-11
CHIMNEY
TRANSFORMER
TRANSFORMER
VC-10
VC-02
VC-09
VC-08
VC-06
W
W
160Ø HDEP
W
W
W
A
B
C
D
E
123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100
CRASH BARRIER
CRASH BARRIER
CRASH BARRIER
CRASH BARRIER
W
HM
HM
HM
HM
HM
W
DG
PDB
EMC BRIDGE
ITDYARD
LPG TERMINAL
03 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160
Ø HDPE PIPE
02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW
03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW 07 NOS 160Ø HDPE PIPE 02 RAW 05 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 1
60Ø HDP
E PIPE 02
RAW
03 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW BUS BAR 160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW BUS BAR160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW
02 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDP
E PIPE 02
RAW
03 NOS 1
60Ø HDP
E PIPE 02
RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW
04 NOS 1
60Ø HDP
E PIPE 02
RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW
05 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW02 NOS
160Ø HDPE PIP
E 02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW
05 NOS 1
60Ø HDP
E PIPE 02
RAW
04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø H
DPE PIPE 03 RA
W
07 NOS 160Ø HDPE PIPE 03 RAW 08 NOS 160Ø HDPE PIPE 03 RAW 08 NOS 160Ø HDPE PIPE 03 RAW 08 NOS 160Ø HDPE PIPE 03 RAW 03 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW
03 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 1
60Ø HDP
E PIPE 02
RAW02 NO
S 160Ø HDP
E PIPE 02 RA
W02 NO
S 160Ø HDP
E PIPE 02 RA
W
160Ø HDPE PIPE 02 RAW
05 NOS 1
60Ø HDP
E PIPE 02
RAW05 N
OS 160Ø
HDPE PIP
E 02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
09 NOS 1
60Ø HDP
E PIPE 02
RAW
09 NOS 160Ø HDPE PIPE 02
RAW
05 NOS 160Ø HDPE PIPE 02 RAW
05 NOS 160Ø HDPE PIPE 02 RAW
05 NOS 160Ø HDPE PIPE 02 RAW 07 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW BUS BAR
07 NOS 160Ø HDPE PIPE 02 RAW 11 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 1
60Ø HDP
E PIPE 02
RAW04 NO
S 160Ø HDP
E PIPE 02 RA
W04 N
OS 160Ø
HDPE PIP
E 02 RAW
05 NOS 160Ø HDPE PIPE 02 RAW 05 NOS 160Ø HDPE PIPE 02 RAW 05 NOS 160Ø HDPE PIPE 02 RAW160Ø HDPE PIPE 02 RAW 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø H
DPE PIPE 03
RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
02 NOS 160Ø
HDPE PIPE 0
3 RAW
03NOS 160Ø HDPE PIPE 02 RAW 05 NOS 160Ø HDPE PIPE 02 RAW 07 NOS 160Ø HDPE PIPE 03 RAW 08 NOS 160Ø HDPE PIPE 03 RAW 08 NOS 160Ø HDPE PIPE 03 RAW 08 NOS 160Ø HDPE PIPE 03 RAW 08 NOS 160Ø HDPE PIPE 03 RAW 04 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
160Ø HDPE PIPE 02 RAW
05 NOS 1
60Ø HDP
E PIPE 02
RAW
05 NOS 1
60Ø HDP
E PIPE 02
RAW05 N
OS 160Ø
HDPE PIP
E 02 RAW
160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW BUS BAR
02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 1
60Ø HDP
E PIPE 02
RAW
02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIP
E 02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 160
Ø HDPE PIP
E 02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW BUS BAR
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIP
E 02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 1
60Ø HDP
E PIPE 02
RAW04 N
OS 160Ø
HDPE PIP
E 02 RAW
04 NOS 160
Ø HDPE PIPE
02 RAW
04 NOS 1
60Ø HDP
E PIPE 02
RAW06 N
OS 160Ø
HDPE PIP
E 02 RAW
05 NOS 1
60Ø HDP
E PIPE 02
RAW05 N
OS 160Ø
HDPE PIP
E 02 RAW
05 NOS 1
60Ø HDP
E PIPE 02
RAW05 N
OS 160Ø
HDPE PIP
E 02 RAW
05 NOS 1
60Ø HDP
E PIPE 02
RAW05 N
OS 160Ø
HDPE PIP
E 02 RAW
05 NOS 1
60Ø HDP
E PIPE 02
RAW
02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW BUS BAR160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 07 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW04 NOS 160Ø HDPE PIPE 02 RAW160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 07 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW BUS BAR
05 NOS 1
60Ø HDP
E PIPE 02
RAW05 N
OS 160Ø
HDPE PIP
E 02 RAW
160Ø HDP
E PIPE 02
RAW
160Ø HDPE PIPE 02 RAW160Ø HDPE PIPE 02 RAW
06 NOS 1
60Ø HDP
E PIPE 02
RAW06 N
OS 160Ø
HDPE PIP
E 02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
06 NOS 160
Ø HDPE PIPE
02 RAW
06 NOS 160
Ø HDPE PIPE
02 RAW
06 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
02 NOS 160
Ø HDPE PIPE
02 RAW
160Ø HDPE PIPE 02 RAW BUS BAR
160Ø HDPE PIPE 02 RAW BUS BAR 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW BUS BAR
05 NOS 160Ø HDPE PIPE 02 RAW 05 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW
08 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW BUS
BAR
08 NOS 160Ø HDPE PIPE 02 RAW 11 NOS 160Ø HDPE PIPE 02 RAW 07 NOS 160Ø HDPE PIPE 02 RAW 07 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW 160Ø HDPE PIPE 02 RAW BUS BAR
05 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW 08 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW 05 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02
RAW BUS BAR
06 NOS 160Ø HDPE PIPE 02 RAW 10 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW
160Ø HDPE PIPE 02 RAW BUS BAR160Ø HDPE PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
04 NOS 160
Ø HDPE PIPE
DB
HOSPITALITY
HIRISE
HOSPITALITY PVT. LTD.
HOTELPANCHSHIL
MARSHYAREA
MARSHYAREA
MUNDRA SOLAR TECHNO PARK LTD.
LP
W
VERTICAL LOOP
SLPOE LOOP
VERTICAL LOOPWW
WW
W
W
W
W
WWW
INSULATED PIPE
INSULATED PIPEINSULATED PIPE
INSULATED PIPE
SS PIPELINESS PIPELINE
UN USED PIPE
VERTICAL LOOP
INSULATED PIPE
INSULATED PIPEINSULATED PIPE12"Ø INSULATED PIPE
12"Ø INSULATED PIPE
08"Ø SS PIPELINE
SS PIPELINE
16"Ø UN USED PIPE
12"Ø
04"Ø 12"Ø
12"Ø 12"Ø 08"Ø 12"Ø 2.5"Ø
08"Ø 16"Ø 06"Ø
08"Ø SS PIPELINE
16"Ø
FENCING
FENCING
THRESHOLD 05
W
VALVE & METER
SVCT TRANSPORT
MARUTI TRANSPORT
EXISTING ENTRY
W
CETP AREA
(SKAPS INDUSTRIES INDIA Pvt. Ltd.)
FOAM POURER LINE
FIRE SPRAY LINE
FOAM POURER LINE
SUCTION LINE
SUCTION LINE
PDB
W
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
VALVE
FH
FM
FH
FH
FH
FM
FH
150Ø PVC PIPE
CSS
ROOF
ROOF
W
W
W
W
W
WW
U/G PIPE 50mmØ
CSS
CSS
PDB
PDB
PDB
PDB
PDB
SRJ
SRJ
SRJ
COMMU.
BOX
SP
COMMUNICATION
BOX
CRASH BARRIER
CRASH BARRIER
CRASH BARRIER
CRASH BARRIER
CRASH BARRIER
CRASH BARRIER
SOLAR
LIGHTING POLE
LIGHTING POLE
SOLAR
ABANDONED FENCING
ABANDONED FENCING
LP
LP
LP
ISCR 120 RAIL
EXP. JOINT
ISCR 120 RAIL
EXP. JOINT EXP. JOINT EXP. JOINT EXP. JOINT
FENCING INSERT PLATE
200Ø FIRE LINE PIPE
160Ø HDEP
160Ø HDEP
160Ø HDEP
W
FB
FB
FB
FB
70Ø HDPE PIPE
FB
FB
FB
FB
03 NOS 160Ø HDPE PIPE 02 RAW
BUNKERING LINE
48"Ø OIL PIPELINE
48"Ø OIL PIPELINE
14"Ø FIRE PIPELINE
W
W
W
VALVE
VALVE
24"Ø FIRE PIPELINE
BOUNDARY WALL
SECURITY CABIN
PLA
NT
AT
ION
PLA
NT
AT
ION
PLANTATION
PLANTATION
PLANTATION
PLANTATION
LP
LP
LP LP LP
LP
LPLP
LP
LP
COMMU. TOWER
COMMU. TOWER
DG STEP
PDB
CT-3
W
HM
LP
LP
VALVE
EXISTING IOCL PIPE LINE
FIND BY LINE LOCATOR FROM IOCL
EXISTING IOCL PIPE LINE
FIND BY LINE LOCATOR FROM IOCL
PDB
PLANTATION
TREE LINE
TREE LINE
TREE LINE
TREE LINE
SB
LP
SP
SP
SP
SP
DP
DP
DP
DP
DP
CB
CB
CB
CB
CRASH BARRIER
HANDRAILING
COMMU.
HANDRAILING
HAND RAILING
HAND RAILING
HAND RAILING
HAND RAILING
BUNKERING LINE BOTTOM OF JETTYPOCKET IN LONG BEAM IL:-7.00
GSB FILLING
GSB FILLING
GSB FILLING
TREES
TREES
TREES
TREES
TREES
BITUMEN PAVED
CC
RO
AD
CC
RO
AD
CC ROAD
CC ROAD
W
VALVE
VALVE
W
W
16" PIPELINE
4" PIPELINE12" PIPELINE
16" PIPELINE
12" PIPELINE
16" PIPELINE12" PIPELINE
16" PIPELINE12" PIPELINE
16" PIPELINE
12" PIPELINE
02 PIPE 450Ø
BOX
PDB
BOX
BOX
EXISTING IOCL PIPE LINEFIND BY LINE LOCATOR FROM IOCL
EXISTING IOCL PIPE LINEFIND BY LINE LOCATOR FROM IOCL
EXISTING IOCL PIPE LINE
FIND BY LINE LOCATOR FROM IOCL
ROW STONE
ROW STONE
ROW STONE
ROW STONE
KM-6
PIPELI
NE MARK
ING
POLE
PIPELI
NE MA
RKING
POLE
PIPELINE MARKING
POLE
PIPE UNDER GROUNDAPPROXIMATE 2.35 mtr.
PIPE UNDER GROUNDAPPROXIMATE 1.84 mtr.
PIPE UNDER GROUND
APPROXIMATE 1.90 mtr.
PIPE UNDER GROUNDAPPROXIMATE 2.00 mtr.
PIPE UNDER GROUND
APPROXIMATE 2.00 mtr.
PIPE UNDER GROUND
APPROXIMATE 2.10 mtr.
PIPE UNDER GROUND
APPROXIMATE 2.30 mtr.
PIPE UNDER GROUNDAPPROXIMATE 2.10 mtr.
PIPE UNDER GROUNDAPPROXIMATE 2.20 mtr.
PIPE UNDER GROUNDAPPROXIMATE 1.80 mtr.
PIPE UNDER GROUND
APPROXIMATE 1.71 mtr.
BOUNDARY WALL
BOUNDARY WALL
BOUNDARY WALL
28" CRUDE LINE 48" CRUDE RECEIPT LINE
TREE LINE
TREE LINE
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
CSS
IOC
L P
IPE
LIN
E C
OR
RID
OR
SRJ
SRJSRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
CB
COMMU. BOX
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TREE LINE
TR
EE
LIN
E
TR
EE
LIN
E
TR
EE
LIN
E
TR
EE
LIN
E
TR
EE
LIN
E
TR
EE
LIN
E
TR
EE
LIN
E
TR
EE
LIN
E
DG
SRJ
SRJ
CB
SB
SB
56/7
56/8
SB
SB
SB
SB
SB
SB
RAILWAY
RAILWAY
DEAD END
DEAD END
SPSP
SP
BOX
DIESELFILLINGPOINT
DIESELFILLINGPOINT
DIESELFILLINGPOINT
DIESELFILLINGPOINT
DIESEL
FILLINGPOINT
DIESELFILLINGPOINT
BOX
BOX
BOX
BOX
BOX
BOX
DIESELFILLINGPOINT
55/9
55/8
SIGNALPOST
COMMU.
BOX
SPSP
SP
MH BOTTOM LVL:-5.75
PIPE TOP LVL :-5.85
MH BOTTOM LVL:-5.75PIPE TOP LVL :-5.90
MH BOTTOM LVL:-5.65
MH BOTTOM LVL:-5.95
APPROX SEWAGE PIPETOP LVL:-5.75
FENCING
VALVE FENCING
HOOK TOP LEVEL
FLANGE TOP LEVEL
PEDESTAL
TOP LEVEL
LAWN
LAWN
LAWN
LAWN
LAWNLAWN
REDUCER
CSS
EMPEZER
EMPEZER
OFFICE
LP
LP
LP
LP
LPLP
COCONUT TREE
CASUARIN
A TREE
CASUAR
INA TRE
E
CASUARIN
A TREE
LP
LP
LP
LP
LP
LP
LP
LP
LP
WOODEN FENCE
WOODEN FENCE
CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER CRASH BARRIER
LP
LP
LP
LP
LP
LP
LP
LPLP
LP
LP
LPLP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
COCONUTSTREES
COCONUTSTREES
LP
LP
LP
LP
LP
LP
LP
LP
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
PLANTATION
PLANTATION
DAMAGE FENCE
JIO CA
BLE CR
OSSING
PDB
PLANTATION
PLANTATION
PLANTATION
PLANTATION
GREEN BELT
PARKING
PARKING
PIPE CORRIDOR
PIPE CORRIDOR
FH
FH
WVALVE
PDB
PDB
WATER PUMP
PDB
PDB
WVALVE
FH
PDB
PDB
PDB
PDB
FH
FHFHVALVE
FH FH
RAILING
FH
FH
FH
FH
FH
BOX
BOX
PDB
FORM TANKNO.6
FORM TANKNO.6
04 PIPELINE IN U/G
LP
LP
LP
LP
LP
LP
LP
LP
LPLP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
PDB
PDB
PDB
RAILING
DENSE GRASSLINE U/G
02 4" STE
EL PIPE
12" PIPE
16" PIPE
ELECTRICALLIGHT POLE
ELECTRICALLIGHT POLE
ELECTRICALLIGHT POLE
ELECTRICAL
LIGHT POLE
ELECTRICALLIGHT POLE
ELECTRICALLIGHT POLE
ELECTRICALLIGHT POLE
ELECTRICALLIGHT POLE
PDB
PDB
02 150Ø CONDUIT PIPE
02 150Ø CONDUIT PIPE
HYDRANTFIRE BOX
LP
LP
LP
HYDRANTFIRE BOX
HYDRANTFIRE BOX
HYDRANT
FIRE BOX
HYDRANT
HYDRANT
FIRE BOX
HYDRANT
FIRE BOX
LP
LP
PDB
LP
LP
LP
LP
HYDRANT
HYDRANT
HYDRANT
HYDRANT
HYDRANT
HYDRANT
HYDRANTBOX
BOX
BOX
PDB
PDB
FORM TANKNO.4
WATER LEVEL
FORM TANKNO.3
LP
04 150Ø CONDUIT PIPE
PDB
PDB
HYDRANT
LP
LP
BOX & FH
BOX
LP
LP
LP
LP
PDB
PDB
PDB
FORM TANK
NO.2
FH
FH
PDB
PDB
PDB
PDB
PDB
PDB
FH
FH
FH
FH
FH
FH
BOX
BOX
BOX
FORM TANK
NO.1
FH
FH
FH
BOX
BOX
PDB
PDB
TREE LINE TREE LINE TREE LINE
TREE LINE TREE LINE
TREE LINE
TREE LINE
TREE LINETREE LINE
BOX
FH
PDB
PDB
PIPE C
ORRID
OR
PDB
BOX
BOX
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
BOX
BOX
BOX
BOX
PIPE
CO
RRID
OR
FORM TANKNO.7
CABLE RACKCABLE TRENCH
PIPE U/G
PIPE U/G
FORM TANK
BOX
PDB
PDB
PDB
DAMAGE FENCE
FH
04 150Ø CONDUIT PIPE
PDB
BOX
RELLING
RELLING RELLING
RELLING
RELLING
RELLING
RELLING RELLING
FIRE WATER PIPE
FIRE WATER PIPE
FIRE WATER PIPE
FIRE WATER PIPE
FIRE WATER PIPE
PIPE U/G
VALVEW
12" LINE
12" LINE
W
RAIL
FIRE PIPELINE 10"
PDB
RELLING RELLING
24" LINE
6" FIRE LINE16" LINE
12" LINE16" LINE
PDB
LP
LP
PARKING AREA
GCACPL
NEW CHEMICAL ZONE
VALVE
VALVE
TRANS WORLD CFS
EMPTY CONTAINER YARD
AREA 10 ACER
SB
SB
PDB
03 180Ø CONDUIT PIPE
03 180Ø CONDUIT PIPE
03 180Ø CONDUIT PIPE
02 180Ø CONDUIT PIPE
02 180Ø C
ONDUIT P
IPE
A
B
C
D
E
HM
OIL TANK
CABLE TRENCH
CABLE TRE
NCH
OIL TANK
CABLE TR
ENCH
300Ø SEWAGE HDPE LINE
PLA
NT
AT
ION
PLA
NT
AT
ION
DUMMY
PILE
CUT OF LVL
+6.50
GREEN BELTGREEN BELT
GREEN BELTGREEN BELT
GREEN BELT
GREEN BELT
GREEN BELT
GREEN
BELT
GREEN BELT
GREEN BELT
GREEN BELT
BITUMEN
PAVED ROAD
AF G B C
-01
-02
-03
-04
-05
05
04
03
02
01
06
ED
08
07
09
F5
F4
FEFD
F1
F2
F3
FA FB FC
13
12
11
10
17
16
15
14
ED
19
18
21
20
22
30
29
28
27
26
25
24
23
36
35
34
33
32
31
ED
37
39
38
40
47
46
45
44
43
42
41
E
53
52
51
50
49
48
D
55
54
58
57
56
65
64
63
62
61
60
59
72
71
70
69
68
67
66
SE
SDSCSBSA
73
S2
S1
76
75
74
81
80
79
78
77
UNLOADING PLATFORM
MD 1 MD 2 MD 3 MD 4MD 5
MD 6
INTERMEDIATESTRUCTURE 1
INTERMEDIATESTRUCTURE 2
BD 1 BD 2 BD 3 BD 4
FLARE
PLATFORM
INTERMEDIATESTRUCTURE
CRAS
H BAR
RIER W
ALL
CRASH BARRIER WALL
CAT WALKCAT WALK
EXP. JOINT
EXP. JOINT
EXP. JOINT
EXP. JOINT
EXP. JOINT
EXP. JOINT
EXP. JOINT
EXP. JOINT
CAT WALK
CAT WALK
RAILING
PDB
TRUCK
02 TANK 75 KL
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
BOXCABLE
8" BUNKERING LINE
8" BUNKERING LINE
PDB
FIRE CHAMBERROAD
RTG TRACK
ROAD
RTG TRACK
ROAD
RTG TRACK
ROAD
RTG TRACK
ROAD
RTG TRACK
CROSS
ING
PAD
CROSS
ING
PAD
BRITANNIA PLOT
02 NOS 160Ø HDPE PIPE 02 RAW
12" PIPE8" PIPE
4" PIPE
12" PIPE
8" PIPE4" PIPE
PIPE JOINT
REINFORCEMENTFABRICATION YARD
FABRICATION YARD
MATERIALSTOCK YARD
04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW04 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW 04 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW 05 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW 06 NOS 160Ø HDPE PIPE 02 RAW
07 NOS 160Ø
HDPE PIPE 0
2 RAW
03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW 03 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW
05 NOS 160Ø HDPE PIPE 02 RAW
06 NOS 160Ø HDPE PIPE 02 RAW
07 NOS 160Ø
HDPE PIPE 0
2 RAW
07 NOS 160Ø
HDPE PIPE 0
2 RAW07 NO
S 160Ø HDPE
PIPE 02 RAW
07 NOS 160Ø
HDPE PIPE 0
2 RAW07 NO
S 160Ø HDPE
PIPE 02 RAW
06 NOS 160Ø HDPE PIPE 02 RAW
06 NOS 160Ø
HDPE PIPE 0
2 RAW06 NO
S 160Ø HDPE
PIPE 02 RAW
06 NOS 160Ø
HDPE PIPE 0
2 RAW06 NO
S 160Ø HDPE
PIPE 02 RAW
06 NOS 160Ø
HDPE PIPE 0
2 RAW
HM-04HM-03
HM-04
06 NOS 160Ø
HDPE PIPE 0
2 RAW06 NO
S 160Ø HDPE
PIPE 02 RAW
06 NOS 160Ø
HDPE PIPE 0
2 RAW06 NO
S 160Ø HDPE
PIPE 02 RAW
06 NOS 160Ø
HDPE PIPE 0
2 RAW06 NO
S 160Ø HDPE
PIPE 02 RAW
02 NOS 160Ø HDPE PIPE 02 RAW 02 NOS 160Ø HDPE PIPE 02 RAW
06 NOS 160Ø HDPE PIPE 02 RAW
06 NOS 160Ø HDPE PIPE 02 RAW 07 NOS 160Ø HDPE PIPE 02 RAW
08 NOS 160Ø HDPE PIPE 02 RAW
09 NOS 160Ø HDPE PIPE 02 RAW
07 NOS 160Ø
HDPE PIPE 0
2 RAW
09 NOS 160Ø
HDPE PIPE 0
2 RAW
08 NOS 160Ø
HDPE PIPE 0
2 RAW08 NO
S 160Ø HDPE
PIPE 02 RAW
HM-05
HM-1A HM-1B04 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160Ø
HDPE PIPE 0
2 RAW
03 NOS 160Ø
HDPE PIPE 0
2 RAW
07 NOS 160Ø
HDPE PIPE 0
2 RAW07 NO
S 160Ø HDPE
PIPE 02 RAW
07 NOS 160Ø HDPE PIPE 02 RAW06 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW
06 NOS 160Ø
HDPE PIPE 0
2 RAW06 NO
S 160Ø HDPE
PIPE 02 RAW
HM-02
04 NOS 160Ø HDPE PIPE 02 RAW04 NOS 160Ø HDPE PIPE 02 RAW
CSS-07 HM-06CSS-6
CSS-05
CSS-02 CSS-04CSS-03
CSS-01
07 NOS 160Ø
HDPE PIPE 0
2 RAW06 NO
S 160Ø HDPE
PIPE 02 RAW
04 NOS 160Ø HDPE PIPE 02 RAW04 NOS 160Ø HDPE PIPE 02 RAW04 NOS 160Ø HDPE PIPE 02 RAW04 NOS 160Ø HDPE PIPE 02 RAW04 NOS 160Ø HDPE PIPE 02 RAW11 NOS 160Ø HDPE PIPE 02 RAW11 NOS 160Ø HDPE PIPE 02 RAW11 NOS 160Ø HDPE PIPE 02 RAW03 NOS 160Ø HDPE PIPE 02 RAW
03 NOS 160Ø HDPE PIPE 02 RAW
06 NOS 160Ø
HDPE PIPE 0
2 RAW
10 NOS 160Ø HDPE PIPE 02 RAW 11 NOS 160Ø HDPE PIPE 02 RAW 8 NOS 160Ø HDPE PIPE 02 RAW
8 NOS 160Ø HDPE PIPE 02 RAW 7 NOS 160Ø HDPE PIPE 02 RAW 6 NOS 160Ø HDPE PIPE 02 RAW
13 NOS 160Ø
HDPE PIPE 0
2 RAW
12 NOS 160Ø HDPE PIPE 02 RAW
08 NOS 160Ø
HDPE PIPE 0
2 RAW08 NO
S 160Ø HDPE
PIPE 02 RAW
08 NOS 160Ø
HDPE PIPE 0
2 RAW
CSS-12
HM-07
HM-08
HM-09 HM-10
HM-11
CSS-09 CSS-10 CSS-11
CSS-08
02 NOS 160Ø HDPE PIPE 02 RAW
PDB
ENCL 17 UNDER CONSTRUCTION
THERMIC FLUID
DRAIN TANK
CHIMNEY
3000 KL
PDB
FIRE PIPE 200Ø
FIRE PIPE 200Ø
DIESEL HSD PIPE 50Ø
FIRE PIPE 200Ø
FIRE PIPE 200Ø
FIRE PIPE 200Ø
BITUMEN RECEIVED PIPE 200Ø
BITUMEN LODING PIPE 150Ø
LOADING PIPE 200ØAIR P IP E 5 0Ø E ND
THERMIC FLUID OUT LET
PIPE 100Ø
THERMIC FLUID OUT LETPIPE 50Ø
THERMIC FLUID OUT LETPIPE 50Ø
THERMIC FLUID IN LETPIPE 100ØAIR P IP E 5 0ØAIR P IP E 5 0Ø
AIR P IP E 5 0Ø
DIESEL HSD PIPE 50Ø
BITUMEN RECEIVED PIPE 200Ø
THERMIC FLUID OUT
PIPE 100Ø
THERMIC FLUID IN PIPE 100Ø
DIESEL HSD PIPE 50Ø
THERMIC FLUIDHEATER
SUMP DRAW-OFF PIPE 150Ø SUMP DRAW-OFF PIPE 200Ø BITUMEN RECEIVED PIPE 200Ø
LP LP LP LP
LP
LP
LP
PIPE END
PIPE END
PIPE ENDPIPE END
LPLP
LP
BITUMEN TANK
T-204
FIRE PIPE U/G
OFC
OFC
DAMAGE FENCING
DAMAGE FENCING
FENCE
FENCE
WW
FH
FH
FH
PRE-CAST WALL UNDER CONSTRUCTION
W
VALVE
W
VALVE
W
VALVE
W
W
VALVE
W
VALVE
W
VALVE
W
W
VALVE
PRE-
CAST
WAL
L UN
DER
CONS
TRUC
TION
55/1
55/0
54/9
EP BOX
CB
CB
54/9
DS LINE
SB
CB
CB
SP
SB
CB
CB
CB
SP
CB
CB
SP
SP
CB
CB
CBCB
CB
SP
55/0
55/0
54/6
54/5
SB
CURVENO. 16
SEJ
SB
SEJ 19
SP
SRJ
SRJ
CB
CB
CB
SRJ
SEJ
NO. 18
SB
SB
54/0
SB
CB
54/0
SRJ
53/5
53/0
SB
SB
SB
CB
SB
CB
SB
SB
SB
SB
CB
SP
CB
CB
LP SP
SP
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SEJ
SEJ
SEJ
SP
SB
SB
SP
CB
CB
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
LP
56/3
56/6
56/7
56/8
56/9
57/2
57/3
SRJ
WL
WL
56/2
55/3
SB
SRJ
SRJ
SRJ
SRJ
SPSRJ
SRJ
SRJ
SRJ
CB
SRJ
SRJ
SP
SP
SRJ
CB
CB
COMMUNICATIONBOX
SP
SP
CB
WL
SB
WL
WL
WL
WLSB
WL
SB
TG
SRJ
SP
CB
CB
SRJ
SRJ
SRJ
SP
SP
SRJ
SRJ
SRJ
SRJ
TG
SB
SB
67/9
CB
SP
68/0
68/1
68/2
68/3
68/4
68/5
68/6
68/7
68/8
68/9
69/0
69/1
69/2
69/3
69/4
69/5
69/6
69/7
69/8
69/9
70/0
70/1
70/2
70/3
70/5
70/6
70/7
70/8
70/9
71/0
71/1
71/3
71/2
71/4
71/5
71/6
71/7
SB
SB
SB
SB
CB
SB
CB
SB
SB
SB
71/8
71/9
SB
WL
TG
WL
WL
SPED 15
SPED 15
SRJ
CB
CB
SRJ
CB
72/0
FUEL POINT
DS LINE
WL
SB
74/6
74/5
74/4
74/3
74/2
74/1
SRJ
SRJ
DS LINE
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
DS LINE
SRJ
SRJ
SRJ
SRJ
DS LINE
SRJ
SRJ
DS LINE
DS LINE
SRJ
DS LINE
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
DS LINE
DS LINE
DS LINE
DS LINE
SRJSRJ
SRJ
EP PENAL
EP PENAL
EP PENAL
EP PENAL
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
SRJ
RECLAMATIONUNDER PROGRESS RECLAMATION
UNDER PROGRESS
RECLAMATIONUNDER PROGRESS
CABLE TRAY
CABLE TRAY
CO
NC
ER
TIN
A
HM
INDEV
METERROOM
Coconut4m x 4m
BhungaR2.20
Sloppy LawnSloppy Lawn
Sloppy LawnSloppy Lawn
Road
Flat Lawn
Flat Lawn
Road
Road
Road
Road
Road
Casurina Topiary
Flat Lawn
Pomegranate Hedge
Pathway
Pomegranate Hedge
PomegranateHedge
Paver Area
R.3.0M
Ø6.000
Bottle Palm
PLA
NTATIO
N
G-5
17
64.3
4 s
q.m
t
G-6
2208.0
0 s
q.m
t
G-9
3160.2
0. s
q.m
t
1 BHK
1 BHK1 BHK
1 BHK
1 BHK1 BHK
1 BHK1 BHK
1 BHK
1 BHK
1 BHK
1 BHK
1 BHK
1 BHK
Garden
1 BHK
1 BHK
Garden
Children Park
3.66m
21.34m
1.22m
2.64m
Stumps
Bowling Crease
Popping Crease
Return Crease
20.12m
Pit
ch
Cricket Ground
Inermi Hedge
Casurina1m x 1m
Casurina1m x 1m
Casurina1m x 1m
Casurina1m x 1m
Casurina1m x 1m
Casurina
1m x 1m
Casurina1m x 1m
Entry Gate
COURT
TENNIS COURT
BASKETBALL
COURT
ENTRY
pl.
pl.
pl.
pl.
pl.
pl.
pl.
pavers
GD01
GD01GD01
GD08
GD02
TOILET
STORE
PLAYER SIT OUT
PLAYER SIT OUT
planter
planter
planter
±0.00
+ 150
+ 450+ 600
ENTRY
INDOOR GAMES
GYMNASIUM
ADMINISTRATION
6.0 M W
IDE ROAD
ROAD
5.5 M WIDE ROAD
5.5 M WIDE ROAD
AMBULANCE
PARKING(4 NO.)
6.0 M WIDE ROAD
CUL DE SAC FOR
SERVICE'S VEHICLES
CUL DE SAC FOR
SERVICE'S VEHICLES
1
117
ENTRY
SCOOTER PARKING
4mX10m
ENTRY
EXIT
SLOPE
1 IN 230
SLOPE
1 IN 230
RAMP UP
1 IN 15
A
B
E
C
D
J
6.0 M
WIDE SERVICE ROAD
SPACE FOR DG,TRANSFORMER 101112
1
23456
78 9
CAPACITY 100000 LITS.
WATER DEPTH. -2.0
0
FIRE WATER TANK
CAP.26000 LITS.
W.DEPTH.-2.00
DOMESTICWATER TANK
PUMP ROOM
LVL.+7.95
LVL. +6.20
LVL.+6.20
LVL.+7.05
PEBBLE
PEBBLE
PEBBLE
1
5.5 M WIDE ROAD
3
4
9
10
20
21
35
36
39
40
45
46
49
12
13
27
28
42
43
61
50
57
58
69
70
84
110∅R.W.P.
110∅ VENT PIPE
110Ø 110ØTRAP
110Ø 110Ø110Ø
110∅R.W.P.
110∅R.W.P.
110ØTRAP
80Ø
150Ø
80Ø
150Ø
WC WC
WC
WC
AHU
WASHING
STAFF CH.&
RECEPTION
X - RAY - I
LAUNDRYHOUSE
KITCHEN
L T PANEL
ENGG OFFICE
MED.
HT. PANEL
HT. PANEL
LOCKERSSTAFF CH.& LOCKERS
CON. 6
CON. 7
CON. 5
CON. 4
CON. 3
CON. 1
CON. 2
WAITING
O P D TOIL.
WAITING EMERGENCY
CU.&MED
DU.
TOIL.
EMERGENCY
OBSERVATION
CON.
CH.
CH. DARK ROOM
TOIL.
X - RAY - 2
DIAGNOSTICS & RADIOLOGY
IMAGING, ENDOSCOPY
UP
WAITING
ELECTRICAL
FLOOR PANEL
ECG T.M.T.
ECHO
REPORTING CUM.RECP.
DRESSING
SERVICE ENTRANCE
REC.
A/C
SHAFT
WC
WC
WC
WC
WAITING
NURSE STN.&
ULTRA SOUND -2
MAIN ENTRANCE LOBBY
FHC
JANITOR
KEEPING
MAIN ENTRY
CORRIDOR
UP
TROLLEY BAY
Expansion Joint
CON. 8
CON. 9
CON.10
CON.11 LIFT LOBBY
SAMPLE COLLECTION
WATER DRINKING
GAS TOI.
CH
CH
CH CH
TOI.
BLOCK-A
BLOCK-B
BLOCK-C
A H U
A H U
FHC
SECURITY
FHC
BOILER
MORTUARY
GARBAGEROOM
BIOMEDICAL WASTE
GLASS WASTE
GENERAL WASTE
PLASTIC WASTE
SHARPS WASTE
Expansion Joint
DIETICIAN'S
OFFICE DIET.'S KIT. WASH
COOKING AREA
WET AREA
SERVERYAREA
CHEF'S DESK
STORE
VEG.PREP.
NONVEG.PREP.COLDPANTRY
ULTRA SOUND -1
UP
UP
UP
UP
UP
LIFT
LOBBY
SERVICE LIFT
SERVICE LIFT
STORE
CHANGE
CONSOLE
C T SCAN
TOIL. PROCEDURE
A H U
DOCTOR
NURSE
TOI. (M) TOI. (F)
STRETCHER
WHEELCHAIR PARKING
TELEPHONE
REGISTRATION INQUIRY
WAITING
CHIEF
MED.
ADMISSION
ADMINISTRATOR
HOS. PATIENT OPERATING
OFFICER ADMINISTRATOR
DN
DN
WALL ON HOLD
WALL ON HOLD
WALL ON HOLD
WALL ON HOLD
WALL ON HOLD
WALL ON HOLD
/ EXIT
AC PLANT ROOM
2100x2000 SECURITY ROOM LEL.+8.45MM
Ficus In
fectoria
Ficus
Infec
toria
Washing
tonia F
.F.
Washing
tonia F
.F.
Ficus In
fectoria
Ficus Infectoria
Coconut
Coconut
R O
A
D
R100
SEPTIC TANK
(2x1.8)
5.3 MTR
. WID
E P
AVER
RO
AD
Sloppy
Lawn
Flat Lawn
Flat Lawn
BounganvalliaHedge
UP
UP
UP
UP
UP
UP
UP
RAMP UP
UP
UP
RAMP UP
RAMP UP
TWO WHEELER PARKING (16 TWO WHEELERS)
ENTRY
EXIT
PAVED AREA
PAVED AREA
PAVED AREA
PAVED AREA
DRAINAGE TRENCH
DRAINAGE TRENCH
DRAINAGE TRENCH
DRAINAGE TRENCH
PAVED AREA
PAVED AREA
PAVED AREA
PAVED AREA
MAI
N AP
PRO
ACH
RAOD
AMENITY CENTRE
150 Ø RWP (F/A)
150 Ø RWP (F/A)
SLOPE 1:120
160 Ø ESP
160 Ø ESP
SLOPE 1:120
MANHOLE 600 x 600 I.L. 7.70
MANHOLE 800 x 1000 I.L. 7.65
MANHOLE800 x 1000 I.L. 7.40
MANHOLE 800 x 1000 I.L. 7.20
CATCH BASIN 400 x 400I.L. 7.85
150 Ø SWP
TO EXISTING STORM WATER DRAIN
TO EXISTING STORM WATER DRAIN
VALVE WITH CHAMBER
F.T.
Sloppy lawn
Sloppy lawn
Sloppy lawn
Sloppy lawn
Sloppy lawn
Lilly
Lilly
Lilly
Lilly
Sloppy lawn
Casurina 1m x 1m
Raphis palm
Sloppy law
n
Sloppy lawn
Bhunga
Match w
ith MICT Road
CHILD
RENS'
PARK
S3
S2
SWIMMING POOL
TENNIS COURT
BADMINTON COURT
DINING
HOSTEL
PAVILLION
PAVILLION
STUDIO APTS.
HOSTEL
CAR PARK
40 carsCAR PARK
PHASE
2
VILLAGE ROAD
MEDICAL CENTRE
SERVICE AREA
PLINTH LVL = 100.2019097.63 SMT
X
S L O P E
OLD ROAD
50KL Water Tank
39
19.60
39.37
16.930
16.600
1
2
3
4 5
6
7
8
9
10
11
12
13 14
15
600 X 450 MM ROUGH KOTA STONE
60 MM THK. PAVER BLOCK
BLOCK MASONRY WALL
WITH KOTA TOP
BLOCK MASONRY WALL WITH KOTA TOP
50 HDPE LINE
WATER
SUPPLY UG
TANK
SHED
ELECTRICAL
PANEL ROOM
LP
W.M.Chamber
ROAD
NEW
BOREWELL
25x15M SPACE FOR
STP (350 CUM
METER PAR DAY)
ENTRY POINT
FOR SEWER
MH
EP
EP
EP
EP
LP
MHLP
MH
MH
EPR
RO PLANT
UGT
SPT
SPT
EXISTING3 BUNGLOWS
7.50
MT.
WID
E R
OAD
7.50 MT. WIDE ROAD
Walking Way
Topiary
Pathway
Water tank
10 KL Cap.
Flat Lawn
Electr
ical
Plumeria
Alba
Lilly
Store
Gate
Bottl
e Pa
lm
Floriculture
Seating
Walking Way
Existing
Nursery Area
Steps Steps
WAITING ZONE
FORVISITORS & PARENT
S
SECURITYENTRY
ENTRY
E NTRY
B.W. BA RRIOR
SOLAR SYSTE
M SPACE FOR P
RACTICAL
FOR STUDE
NTS (1.5 M W
IDTH) FOR S
OLAR SYST
EM
REST SPACE
FLORICULTU
RE
LEAF COMPOST
VERMICULTURE
SPACE FOR
PRACTICAL SPACE FOR
PRACTICAL
SPACE
FORPRACTICAL
HEDGE
COLONY M
AIN ROAD
LAWN
SPACE
FOR PRACTICAL
ENTRY
ENTRY
SC
IEN
CE
& T
EC
HN
OL
OG
Y
PA
RK
123
45
6
7
8
9
10
11
12
1314
15161718
19
2021
22
23
24
25
26
27
2829
30
31
34
35
36
37
3839
40
41
32
33
3
3231
SEASONAL FLOWERS
2.50m. wide Pathway
STP
2.YOGA SPACE
IN NATURE
(Space for 50 Person)
Flame of forest or Delonix regia( red)Tree
Azardicta indica Tree(for purification of air from STP Side as a protective Tree.)
Azard
icta i
ndica
Tree(
for pu
rifica
tion o
f air f
rom ST
P Side
as a
protec
tive T
ree.)
Ready cocos spp.(Coconut)Tree
(As per Vastu & productive view.)(Dist. 6.0x6.0)
Cassia fistula or Peltophorum Tree
Flat Lawn
2.0 M. wid
e Paved Pa
thway
2.440
Inerme Hedge
Delonix Regia
Ready
cocos s
pp.(Co
conut)T
ree(As
per V
astu &
produc
tive vie
w.
Delonix regia
Delonix regia
Delonix regia
Seating
Mimuso
p elang
i or Fic
us nitid
a or sem
enia sem
an read
y tree(1
0-15 ft h
i)
Peltophorum Spp.
6.00
6.00
6.00
6.00
Ready cocos spp.(Coconut)Tree
(As per Vastu & productive view.)(Dist. 6.0x6.0)
Delonix regia
Delonix regia
Ready cocos spp.(Coconut)Tree
(As per Vastu & productive view.)(Dist. 6.0x6.0)
Ready cocos spp.(Coconut)Tree
(As per Vastu & productive view.)(Dist. 6.0x6.0)
11.263
15.240
2.000
14.202
10.50
Inermi Hedge
Peltophorum Spp.
Peltophorum
Spp.
Inermi Hedge
21.00 m.
36.00
47.338
4.00 M. W
ide
Pathway
4.00 M. W
ide
Pathway
4.00
21.008.906
9.00
7.00
7.000
4.0028.00
2.000
2.000
6.006.006.00
Lilly
TEMPLE
7a
Pathway(In-Way)
Pathway(Out-Way)
Pathway for Temple Round
Pathway for Temple Round
Security Ca
bin
2.40 M. W
ide Pathwa
yfor H
andicapped
Flat Lawn
2.0 m
. Wide
Pathw
ay
ENTRY
Ficus Panda Topiary
Ficus Panda Topiary
Sloppy Lawn
Inermi Hedge
4.00 M. W
idePath
way
SEASONAL FLOWERS
Flat Lawn
2.000
10.750
Sloppy Lawn
Slop
py L
awn
Flat Lawn
4.00 M. W
idePath
way4.00
M. Wide
Pathway
4.00 M. W
idePath
way
2.50 M. WidePathway
2.50 M. Wide
Pathway
2.40 M. W
ide Pathwa
yfor H
andicapped
Washingtonia
With Bougainvillea
Ficus Panda
Topiary
Ficus Panda
Topiary
Washingtonia
With Bougainvillea
4.200
5.600
4.8002.800
2.800
2.800
2.800
2.800
2.800
4.200
Vinca
Vinca
2.000
SlopeSlope
Slope Slope
Seating
Mimusop elangi
Seating
Mimusop elangi
Flat Lawn
Flat Lawn
DUCT
TOILET
BATH
ROOM - 5
ROOM
DUCT
ROOM - 7
TOILET ROOMBATH
ROOM
TOILETBATH
ROOM - 8
ROOM - 6
ROOM
DUCT
TOILETBATH
TOILET
BATH
ROOM - 4
ROOM
Sofa cum Bed DUCT
TOILET
BATH
ROOM - 2
ROOM
TOILET
BATHROOM - 3
ROOM UP
LIFT
LVL +0.60
DUCT
TOILET
BATH
ROOM - 1
ROOM
Sofa cum Bed
DUCT
ROOM - 9
TOILET ROOMBATH
ROOMTOILETBATH
ROOM - 10
Sofa cum Bed
DUCT
TOILET
BATH
ROOM - 12
ROOMROOM - 11
ROOM
DUCT TOILET
BATH
TOILET
BATH
ROOM - 13
ROOM
DUCT
TOILET
BATH
ROOM - 15
ROOM
TOILET
BATH
ROOM - 14
ROOM
UPLIFT
LVL +0.60
DUCT
TOILET
BATH
ROOM - 16
ROOM
Sofa cum Bed
Sofa cum Bed Sofa cum Bed
Sofa cum Bed
T.V. ROOM
Sofa cum Bed
DUCT
LADIES TOILET GENTS TOILET
DOUBLEHEIGHT
RAMP UP
ENT. FOYER
OFFICE
DINING BLOCK
HAND WASH
DISH WASH
KITCHEN
STORE
MAIN ENTRY
UP
SERVICE ENTRY
LVL ±0.00
4.23 MT. WIDE PASSAGE
4.23 MT. WIDE PASSAGE
PORCH
2.1 MT. WIDE PASSAGE
2.1 MT. WIDE PASSAGE
2.1 MT. WIDE PASSAGE
2.1 MT. WIDE PASSAGE
2.1 MT. WIDE PASSAGE
2.1 MT. WIDE PASSAGE
DUCT
DUCT
Sliding Gat
e
PROPOSEDTOILETBLOCK
Ready cocos spp.(Coconut)Tree(As per Vastu & productive view.)(Dist. 6.0x6.0)
Park
ing
Are
a
PUJARI & WATCHMANBLOCK
Melingtonia indica(Neem) @ 6.0 M. Dist.
Washingtonia
filifera@ 3.0m. Dist.
5.10
1.00
1.00
6.36
2.46
1.521.52
9.20
3.20
8.11
6.00
6.00
1.34
3.80
2.40
Ficus PandaTopiary
UP
UP
UP
Ficus PandaTopiary
Flat Lawn
Natural
Amphitheat
er
UP
2.03
2.03 UP
UP
UP
UP
UP
5.80
20.53
37.310.97 1.35
3.18
4.55
Coc
onut
pal
m 25.17
26.69
38.18
DUCT
GENTS TOILET 2700X3600LADIES TOILET2700X3600
Fenc
ing
18513.00 SMT
PLINTH LVL = 100.60
Flor
icul
ture
2.0 m.
wide
pathw
ay
2.0 m. wide pathway
Flat lawnSloppy
Lawn
Lilly
Foxtail Plam
Foxtail Plam
Foxtail
palm
@ 8.0m
. Spaci
ng
Light
2.0 m. wide pathway
Fountain
Light
Light
LightLightLight
1.201.20
1.20 9.718 5.831
9.718 5.831
9.7185.831
1.20
1.9441.944
Bougainvil
lea
Red/White
Bougainvi
llea
Red/Whit
e
Casurina @1.0m. c/c
Bougainvillea
Red/White
Casurina @1.0m. c/cCasurina @1.0m. c/cPaved area
1.00
1.00
Flat lawn
Flat lawn
Flat lawn
6.00
12.00
6.00
Light
Light
Light
Light
Cleaning Area
Hip Cleaning but not level
6.00 M Wide Road
6.00 M Wide Road
6.0
0 M
Wid
e R
oad
6.0
0 M
Wid
e Road
Existing Concrete Base
GA
TE
Mangrove Conservation Area 04
Area 02
Man
grov
e Con
serv
atio
n Are
a 01
Mangrove Conservation
Mangrove
Area 03Conservation
GB1
GB2
GB4
GB5
MG1
GB5
MA
NG
RO
VE
25 H
A.A
MG2
GB3
GB3
GB6
GB7
GB12
GB9
GB11
GB11
GB8
GB10
GB5
GB5
GB5
Landscape Drawing
SCALE :- N.T.S.
DATE : 14.11.2017
DRG NO. HORTI/APSEZL
Imp
lem
en
ted
Gre
en
Zo
ne
De
ve
lop
me
nt
In A
PS
EZ
L A
rea
(Ma
ng
rove
aff
ore
sta
tio
n a
nd
Co
nse
rva
tio
n,
Gre
en
Zo
ne
are
a &
Ad
dit
ion
al G
ree
n B
elt
De
ve
lop
me
nt)
ADANI PORTS & SPECIAL ECONOMIC ZONE LIMITED,
DEPT.OF HORTICULTURE
MUNDRA .
Lat Long Of Mangrove AreaLat Long Of Green Belt Area
1
2
3
4
5
7
6
8
910
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
38
39
40
41
42
43
44
45
46
47
48
31
Community Awareness Session
Home Fire Safety Awareness Campaign “KNOWLEDGE AT YOUR DOORSTEP II”
On 15.04.2017 and 16.04.2017 home fire safety awareness campaign executed for home makers at
Samudra Township and Shantivan Colony respectively. Compare to last year programme there was
special inclusion in this programme of LPG fire safety which comprises of precautions while taking
delivery of LPG cylinders , response in case of emergency in LPG with practical operation of Fire
Extinguishers. Total 214 families at Samudra Township and 140 Families at Shantivan educated in home
fire safety.
125
Activities carried out from 15.04.2017 to 21.04.2017
Observance of 73rd National Fire Service Week
Home Fire Safety Awareness Campaign “KNOWLEDGE AT YOUR DOORSTEP II_Snaps
126
Organogram of Environment Management Cell, APSEZ, Mundra
CEO APSEZ
Mundra
Associate General
Manager
(Functional Support: HO)
M.E. Environment
Senior Manager
M.Tech & M.Sc.
Environment
Deputy Manager
B.E. (Chemical)
Assistant Manager
B.E. Environment
Senior Officer
M.Sc. Environment
Senior Officer
M.Sc. Environment
127
Cost of Environmental Protection Measures
Sr.
No. Activity
Cost incurred
(INR in Lakh)
Budgeted Cost
(INR in Lakh)
2015 – 16 2016 – 17 2017 – 18 2017 – 18 1. Environmental Study / Audit and
Consultancy
45.45 36.78 9.00 21.00
2. Legal & Statutory Expenses 3.30 4.76 9.48 16.00
3. Environmental Monitoring
Services
26.80 27.95 12.00 36.00
4. Hazardous / Non Hazardous
Waste Management & Disposal
34.56 12.52 31.9 90.84
5. Environment Day Celebration 7.18 6.71 2.68 10.00
6. Treatment and Disposal of Bio-
Medical Waste
1.22 1.27 0.75 1.44
7. Mangrove Plantation, Monitoring
& Conservation
73.64 72.38 60.0 60.0
8. Other Horticulture Expenses 434.72 555.00 494.0 556.5
9. O&M of Sewage Treatment Plant
and Effluent Treatment Plant
(including STP, ETP of Port & SEZ &
Common Effluent Treatment Plant)
18.18 61.50 39.89 69.35
10. Expenditure of Environment
Dept. (Apart from above head)
135.90 131.83 22.83 104.91
Total 837.73 910.70 682.53 966.04